Storage (Duration 0.5h)

4 unique locations (4 components)

Active MW: 2372.71 MW
Inactive MW: 55.35 MW
Land to the West of Harker Grid Sub Station Low Harker Harker Carlisle CA6 4DQ (1 component)

New build transmission connected battery storage site

Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Harker Conditional CA6
Inactive • 2022-23 (T-4)
Land Adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Nursling Conditional SO16
Inactive • 2022-23 (T-4)
Land Adjacent to Norwich Substation Mangreen Lane Stoke Holy Cross Norwich NR14 8PG (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Norwich Conditional NR14
Inactive • 2022-23 (T-4)
Land Adjacent to Braintree Substation Braintree 400kV substation Braintree Road Cressing CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Braintree Conditional CM77
Inactive • 2022-23 (T-4)
Loading map...
Showing 4 locations