Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 0.5h)

26 unique locations (67 components) - Page 1 of 2

Active MW: 2372.71 MW
Inactive MW: 55.35 MW
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (4 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Battery Storage Storage (Duration 0.5h) CLEATOR BATTERY STORAGE LIMITED New Build Generating CMU Cleator Storage Cleator Storage +1 more CA22
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Storage Storage (Duration 0.5h) PEAK GEN POWER 17 LIMITED New Build Generating CMU Peak Gen Power 17 Peak Gen Power 17 Conditional OX28
Inactive • 2022-23 (T-4), 2021-22 (T-4)
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components)

battery storage (3)

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA BS7
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Storage Storage (Duration 0.5h) PEAK GEN POWER 10 LIMITED New Build Generating CMU Peak Gen Power 10 Peak Gen Power 10 +1 more Conditional SG12
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Rufford Colliery Lane, Rainworth, Mansfield, Nottinghamshire, UK, NG21 0HR (1 component)

battery storage with other generation

Storage (Duration 0.5h) HC ESS2 LIMITED Existing Generating CMU ALPHA NG21
Inactive • 2019-20 (T-1)
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (2 components)
• A 10MW Existing Generating Battery Storage Site
• A 10MW New Build Battery Storage Site
Storage Storage (Duration 0.5h) Roundponds Energy Limited Existing Generating CMU Roundponds Storage 1 Roundponds Storage 1 SN12
Inactive • 2019-20 (T-1), 2018-19 (T-1)
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION (2)

Storage Storage (Duration 0.5h) ROSSIDE ENERGY LIMITED New Build Generating CMU ROS ROS Conditional LA12
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

Storage Battery Storage Storage (Duration 0.5h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Roosecote EFR Roosecote EFR +1 more LA13
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (6 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (3)

Storage Storage (Duration 1h) Storage (Duration 0.5h) VATTENFALL WIND POWER LTD Existing Generating CMU Battery@PyC Battery@PyC +1 more Rejected CF42
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
1.30 MW
Lower Road, Brentwood, CM13 1BZ (1 component)

Advanced battery energy storage system

Storage (Duration 0.5h) OSSPV001 LIMITED New Build Generating CMU OSL002 CM13
Inactive • 2019-20 (T-1)
Land to the West of Harker Grid Sub Station Low Harker Harker Carlisle CA6 4DQ (1 component)

New build transmission connected battery storage site

Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Harker Conditional CA6
Inactive • 2022-23 (T-4)
LAND NORTH OF PELHAM SUBSTATION AND SOUTH OF BERDEN ROAD, BERDEN, BISHOP?S STORTFORD, CM23 1BA (Nearest Postcode to grid reference: SG90JB) (2 components)

Battery Storage Plant (2)

Storage Storage (Duration 0.5h) PELHAM STORAGE LIMITED Existing Generating CMU Pelham Storage 027 Pelham Storage 053 CM23
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land North Of Oaklands Park Lane Cottingham East Riding Of Yorkshire, HU16 5RX (Nearrest postcode to grid reference: HU16 5SB) (2 components)

Battery Storage Plant (2)

Storage Storage (Duration 0.5h) CREYKE BECK STORAGE LIMITED New Build Generating CMU Creyke Beck Storage 026 Creyke Beck Storage 052 HU16
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Lookabootye Broxburn West Lothian EH52 5PD (3 components)
• Operational battery (2)
• New build battery
Storage Storage (Duration 0.5h) UK ENERGY STORAGE SERVICES LIMITED New Build Generating CMU Broxburn Energy Storage Broxburn Energy Storage EH52
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Land at Jarrow Slake Port of Tyne Adjacent to Jarrow Road South Shields NE34 9PS (2 components)
• New build battery
• Operational battery
Storage Storage (Duration 0.5h) SOUTH SHIELDS ENERGY STORAGE LTD Existing Generating CMU Port of Tyne Energy Storage Port of Tyne Energy Storage NE34
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Storage Battery Storage Storage (Duration 0.5h) GLASSENBURY BATTERY STORAGE LIMITED New Build Generating CMU Glassenbury Storage Glassenbury Storage +2 more TN17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Land Adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Nursling Conditional SO16
Inactive • 2022-23 (T-4)
Land Adjacent to Norwich Substation Mangreen Lane Stoke Holy Cross Norwich NR14 8PG (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Norwich Conditional NR14
Inactive • 2022-23 (T-4)
Land Adjacent to Braintree Substation Braintree 400kV substation Braintree Road Cressing CM77 8DJ (1 component)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Storage (Duration 0.5h) Pivot Power LLP New Build Generating CMU Pivot Power Braintree Conditional CM77
Inactive • 2022-23 (T-4)
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (2)

Storage Storage (Duration 0.5h) Shaw-Energi Ltd New Build Generating CMU Gateway Crescent New Build Generating CMU Gateway Crescent New Build Generating CMU Conditional OL9
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Carnegie Road, Liverpool, L13 7HY. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Storage Storage (Duration 0.5h) ORSTED ESS MERSEY LIMITED New Build Generating CMU Carnegie Road New Build Generating CMU Carnegie Road New Build Generating CMU Rejected L13
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The … (3)

Storage Storage (Duration 0.5h) E.ON UK CHP LIMITED New Build Generating CMU Blackburn Meadows Battery Blackburn Meadows Battery +1 more S9
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Amersham Road Denham Buckinghamshire SL9 7AW (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

Storage Storage (Duration 0.5h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Peak Gen Power 27 +1 more Conditional SL9
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Amersham Road Denham Buckinghamshire SL9 7AW (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Storage Storage (Duration 0.5h) Field Gerrards Cross Ltd New Build Generating CMU Peak Gen Power 27 Peak Gen Power 27 Conditional SL9
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Albion Road, Dartford, Kent, DA1 5PZ (6 components)

battery storage (3)

Storage Storage (Duration 0.5h) HC ESS2 LIMITED New Build Generating CMU ALPHA ALPHA DA1
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 25 locations