Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 1h)

43 unique locations (518 components) - Page 1 of 2

Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (29 components)
• 25 MW storage site using Lithium Ion Batteries
• Existing 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
36.89 MW
Unit 5, Bloxwich Lane Estate, Walsall, WS2 8DL (8 components)

BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse.

Active • 2025-26 (T-1), 2024-25 (T-1) ...
41.63 MW
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS (14 components)
• 30MW OF BATTERY ENERGY STORAGE SYSTEMS
• 40MW OF BATTERY ENERGY STORAGE SYSTEMS
• BATTERY ENERGY STORAGE SYSTEM
Active • 2026-27 (T-4), 2025-26 (T-1) ...
44.43 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (20 components)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Active • 2026-27 (T-4), 2024-25 (T-1) ...
7.42 MW
Roundswell Business Park, Barnstaple, Devon EX31 3TD (2 components)

Front of the Meter battery storage asset located in Devon.

Active • 2028-29 (T-4), 2024-25 (T-1)
0.70 MW
Richborough Energy Park Ramsgate Road Sandwich CT13 9NL (5 components)
• 49.990 MW battery energy storage system at Richborough Energy Park
• Battery Energy Storage System
• Battery energy storage system at Richborough Energy Park
Active • 2025-26 (T-1), 2024-25 (T-1) ...
35.40 MW
Richborough Energy Park Ramsgate road Sandwich CT13 9NL (6 components)
• 49.990 MW battery energy storage system
• Battery Energy Storage System
• battery energy storage system
Active • 2025-26 (T-1), 2024-25 (T-1) ...
44.70 MW
Potman's Lane, Battle, TN33 9BL (6 components)
• A Battery Energy Storage System
• A Battery Energy Storage System, which has already PQ'd as POTM25
Active • 2025-26 (T-4), 2024-25 (T-1) ...
57.35 MW
Potash Farm, Nash Road, Beachampton, MK19 6EA (9 components)

49.900MW one-hour duration battery energy storage facility.

Active • 2024-25 (T-1), 2023-24 (T-1)
44.44 MW
Plot B at Severn Road Avonmouth BS10 7SE (16 components)
• 15.000MW of Battery Energy Storage Systems
• Existing Generator Battery Energy Storage System
• New Build Battery Energy Storage Systems
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.74 MW
36.31 MW
Old Church Lane, Mountnessing, Hutton, Brentwood, Essex, England, CM13 1UN, United Kingdom (9 components)
• 50MW/50MWh one hour battery
• 50MW/50MWh one hour battery storage
Active • 2026-27 (T-4), 2025-26 (T-1) ...
52.76 MW
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB (12 components)

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt

Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.40 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (11 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
Active • 2025-26 (T-4), 2024-25 (T-1) ...
16.58 MW
Newchurch Road, Bacup, Lancashire, OL13 0BL (9 components)

Battery Storage

Active • 2026-27 (T-4), 2025-26 (T-1) ...
6.61 MW
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (10 components)

Battery storage 40.000MW/40.000MWh one duration battery new build

Active • 2025-26 (T-4), 2024-25 (T-1) ...
29.66 MW
Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE (38 components)

4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs

Active • 2025-26 (T-4), 2024-25 (T-1) ...
122.37 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (14 components)

Battery Storage Plant

Active • 2025-26 (T-4), 2024-25 (T-1) ...
68.11 MW
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (18 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW.
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 years of operation.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
51.54 MW
Land North Of Actrees Solar Farm Heathfield Alkington Gloucestershire GL13 9PP (3 components)

new build battery storage asset 49.900MW/49.900MWh one hour duration

Active • 2025-26 (T-4), 2024-25 (T-1)
11.32 MW
Loading map...
Showing 25 locations