Storage (Duration 1h)

2 unique locations (13 components)

Harestanes Wind Farm, AE Forest, Nr Parkgate, Dumfries and Galloway, DG11 1TU (4 components)

1 x 50MW Lithium-ion battery with duration of 1 hour

Inactive • 2023-24 (T-1)
27.90 MW
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN (9 components)
• 1 x 50MW Lithium-ion battery with duration of 1 hour
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
Inactive • 2021-22 (T-1), 2022-23 (T-1) ...
10.68 MW
Loading map...
Showing 2 locations