Storage (Duration 2h)
75 unique locations (270 components) - Page 1 of 3
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (4 components)
Two hour duration battery storage
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (6 components)
Welkin Road, Bredbury, SK6 2BH (4 components)
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (4 components)
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
Tredington Fields Farm, Claydon Solar B, Tredington, Tewkesbury, GL20 7BS (2 components)
Battery Storage
Titchfield Lane, Wickham, Fareham PO15 6DY (1 component)
CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System)
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (2 components)
Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm.
The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU (2 components)
A 2 hour BESS connecting directly to the DNO network.
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (4 components)
Smithyard Lane, Watchet, TA4 4NN (3 components)
New Build CMU comprising of battery storage and associated plant
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (8 components)
Royle Barn Road, Rochdale, OL11 3DX (2 components)
Battery Energy Storage Site
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (15 components)
Pikevy Farm, Glenrothes, Fife, KY6 3HD (1 component)
This is a 49.9MW battery storage facility connected at 33kV.
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (2 components)
This CMU component represents the BESS system of a co-located (solar and storage) site
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (9 components)
North Tawton, Sampford Courtenay, West Devon, Devon, England, EX20 2DA, United Kingdom (3 components)
30MW/30MWh one hour battery
Netherton Farm, Keith AB55 5PE (3 components)
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (2 components)
Standalone battery storage system connecting at 33kV to the Broxburn substation
Land To The West Of Meardsall Lane,, Swinderby,, North Kesteven, LN6 9JA (2 components)
A standalone 2 hour BESS connecting directly onto the DNO network.
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG (2 components)
A 2 hour BESS connecting directly to the DNO network.
Land to the south of National Grid's Rainhill substation, Lea Green Road, Rainhill WA9 4QD (2 components)
Battery project on greenfield site