Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

75 unique locations (270 components) - Page 1 of 3

Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2025-26 (T-1), 2024-25 (T-1) ...
29.64 MW
Welkin Road, Bredbury, SK6 2BH (4 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.79 MW
Vicarage Drove, Bicker CP, Boston, Lincolnshire, England, PE20 3BQ, United Kingdom (4 components)
• New build 49.995MW / 99.990 MWh battery energy storage system.
• New build CMU. A co-located battery and solar PV site, with a solar generation capacity of 70MW and a shared grid connection.
Active • 2027-28 (T-4), 2025-26 (T-1)
18.20 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW1, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2025-26 (T-1), 2024-25 (T-1) ...
23.96 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (1 component)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System)

Active • 2025-26 (T-1)
13.55 MW
Tiln Farm BESS, Tiln Lane, Retford DN22 9JH (2 components)

Tiln Farm BESS is a 25MW 2-hour storage project built alongside a new solar farm at Tiln Farm.

Active • 2028-29 (T-4), 2025-26 (T-1)
10.79 MW
The Wagon Hovel, The Borrows, Sibthorpe, Newark, NG23 5LU (2 components)

A 2 hour BESS connecting directly to the DNO network.

Active • 2025-26 (T-1)
0.52 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (5 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
10.59 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (4 components)
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.
• Battery energy storage facility with a 2 hour duration and a maximum capacity of 14MW, located in Buxton
Active • 2025-26 (T-1), 2024-25 (T-1)
38.34 MW
Smithyard Lane, Watchet, TA4 4NN (3 components)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-1)
6.44 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (8 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
58.42 MW
Royle Barn Road, Rochdale, OL11 3DX (2 components)

Battery Energy Storage Site

Active • 2025-26 (T-1), 2025-26 (T-4)
16.49 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (15 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
71.09 MW
Pikevy Farm, Glenrothes, Fife, KY6 3HD (1 component)

This is a 49.9MW battery storage facility connected at 33kV.

Active • 2025-26 (T-1)
12.82 MW
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG (2 components)

This CMU component represents the BESS system of a co-located (solar and storage) site

Active • 2025-26 (T-1)
5.03 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (9 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.03 MW
Netherton Farm, Keith AB55 5PE (3 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Active • 2026-27 (T-4), 2025-26 (T-1)
54.30 MW
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (2 components)

Standalone battery storage system connecting at 33kV to the Broxburn substation

Active • 2025-26 (T-1)
12.90 MW
Land To The West Of Meardsall Lane,, Swinderby,, North Kesteven, LN6 9JA (2 components)

A standalone 2 hour BESS connecting directly onto the DNO network.

Active • 2025-26 (T-1)
0.52 MW
Land to the Westfield Farm, Town Street, Westborough, Newark, NG23 5HG (2 components)

A 2 hour BESS connecting directly to the DNO network.

Active • 2025-26 (T-1)
0.52 MW
30.95 MW
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (3 components)
• A 49.9 Energy Storage System
• A Lithium Ion Battery Energy Storage System
• A Lithium Ion Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1)
35.25 MW
Loading map...
Showing 25 locations