Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 5.5h)

8 unique locations (105 components)

Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (10 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• EV charging at residential premises
• Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
51.22 MW
Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (4 components)
• Battery energy storage unit
• Generating Unit 1
• To be confirmed once CMU components are known
Active • 2025-26 (T-4), 2022-23 (T-4)
19.60 MW
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (3 components)
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.36 MW
Land at Mill Hill Substation, Partingdale Road, Barnet, NW7 1NT (2 components)
• A Battery Energy Storage System.
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
Active • 2027-28 (T-4), 2025-26 (T-4)
8.77 MW
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (4 components)
• A Battery Energy Storage System
• A Battery Energy Storage System.
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
Active • 2027-28 (T-4), 2025-26 (T-4) ...
51.77 MW
Foyers Power Station, Foyers, Inverness, IV2 6YB (16 components)
• Construction of a New Generating CMU comprising of gas fuelled reciprocating generation sets and gas delivery plant
• Generating Unit 1
• Generating Unit 2
Active • 2028-29 (T-4), 2027-28 (T-4) ...
603.34 MW
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (48 components)
• 1hr duration battery storage project.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
476.10 MW
Energy Hub, Corner of Rodney Road and Heygate Street, London, SE17 1FJ (18 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3.51 MW
Loading map...
Showing 8 locations