Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 8h)

7 unique locations (131 components)

Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (4 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4)
158.59 MW
Land at Somerford Farm, SN16 9RN (2 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4)
79.30 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (5 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2026-27 (T-4)
140.24 MW
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (2 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4)
79.30 MW
Land 475m NW of Hillcrest Cottage, Shebster KW14 7QY (2 components)

New build BESS to be installed within a future Greener Grid Park.

Active • 2028-29 (T-4)
30.57 MW
Eccles Birgham Farm TD12 4LU (3 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation.
• Lithium ion battery storage plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.76 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (113 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5209.30 MW
Loading map...
Showing 7 locations