Capacity Market Search

Displaying 1 - 50 of 20 matching companies (Page 1 of 60)

Component Results (2951)

Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

FCC BUCKINGHAMSHIRE LIMITED CMU: BUCK02 Energy from Waste CMU De-Rated N/A CMU DB: 23.94 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW

New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant …

FCC Recycling (UK) Limited CMU: LINC01 Energy from Waste CMU De-Rated N/A CMU DB: 11.53 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB"

This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 …

MERCIA WASTE MANAGEMENT LIMITED CMU: MERC02 Energy from Waste CMU De-Rated N/A CMU DB: 17.27 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK

Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd …

Nuclear Decommissioning Authority CMU: NDAMAN Hydro CMU De-Rated N/A CMU DB: 27.30 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
10 Queens Drive , Kilmarnock, KA1 3XF

Load curtailment from refridgeration

LIMEJUMP LTD CMU: DSR_10 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Plot 168, Block D, Unit 11 Greenwood Way OX11 6DL

Load curtailment from refridgeration

LIMEJUMP LTD CMU: DSR_11 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
The Bridge Shopping Centre 11 Somers Road North PO1 1SL

Load curtailment from refridgeration

LIMEJUMP LTD CMU: DSR_11 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Viking Link Ltd, Bicker Fen Converter Station, Northorpe Road, Donington SPALDING PE11 4XY

Viking Link is a HVDC interconnector between GB and Danish transmission systems. Viking Link involved the construction of two converter stations, sited in GB and Denmark. At the converter stations, …

Waterswallows Energy Limited CMU: WATERS VikingLink (Denmark) CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Runcorn Site HQ, South Parade, PO Box9, Runcorn, Cheshire, WA7 4LT

CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand …

INOVYN CHLORVINYLS LIMITED CMU: INO200 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 1 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.

Plutus Energy LTD CMU: SELBY_ Open Cycle Gas Turbine (OCGT) CMU De-Rated N/A CMU DB: 28.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.

Plutus Energy LTD CMU: SELBY_ Open Cycle Gas Turbine (OCGT) CMU De-Rated N/A CMU DB: 28.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.

Plutus Energy LTD CMU: SELBY_ Open Cycle Gas Turbine (OCGT) CMU De-Rated N/A CMU DB: 28.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 2 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 3 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 4 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.

Plutus Energy LTD CMU: SELBY_ Coal CMU De-Rated N/A CMU DB: 0.00 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Drax, Selby, YO8 8PH

This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.

Plutus Energy LTD CMU: SELBY_ Coal CMU De-Rated N/A CMU DB: 0.00 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Olympia Mills, Barlby Rd, Selby YO8 5AF, United Kingdom

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Plutus Energy LTD CMU: SELBY_ DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD

New Build Battery Storage Facility

Plutus Energy LTD CMU: SELBY_ Storage (Duration 4h) CMU De-Rated N/A CMU DB: 16.70 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Selby, North Yorkshire, YO8 6PG

A 40MW Distribution Connected Battery Energy Storage System

Plutus Energy LTD CMU: SELBY_ Storage (Duration 4h) CMU De-Rated N/A CMU DB: 16.70 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.05 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.21 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Selby, North Yorkshire, YO8 6PG

A Distribution Connected Battery Energy Storage System

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 8.38 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

LIMEJUMP LTD CMU: BAT001 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 1.73 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL

Hamms Hall - Existing Site CHP

GRIDBEYOND LIMITED CMU: GBD013 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 1.18 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS

Poole Existing Site CHP

GRIDBEYOND LIMITED CMU: GBD013 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 1.13 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP

Warrington Existing Site CHP

GRIDBEYOND LIMITED CMU: GBD013 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 0.88 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT

Existing Energy from Waste Plant

SUEZ RECYCLING AND RECOVERY KIRKLEES LTD CMU: SUEZ21 Energy from Waste CMU De-Rated N/A CMU DB: 9.23 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY

Existing Energy from Waste Plant

SUEZ RECYCLING AND RECOVERY UK LTD CMU: SUEZ22 Energy from Waste CMU De-Rated N/A CMU DB: 18.89 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY

Existing Energy from Waste Plant

NORTHUMBERLAND ENERGY RECOVERY LTD CMU: SUEZ23 Energy from Waste CMU De-Rated N/A CMU DB: 9.28 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY

Existing Energy from Waste Plant

SOUTH TYNE & WEAR ENERGY RECOVERY LTD CMU: SUEZ24 Energy from Waste CMU De-Rated N/A CMU DB: 20.55 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE

Existing Energy from Waste Plant

SUEZ RECYCLING AND RECOVERY SUFFOLK LTD CMU: SUEZ25 Energy from Waste CMU De-Rated N/A CMU DB: 23.34 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Aikengall IIa Wind Farm Innerwick EH42 1SG

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation.

AIK2A SUSTAINABLE ENERGY LTD CMU: AK2a01 Onshore Wind CMU De-Rated N/A CMU DB: 5.43 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Stagecoach Services Ltd, Bus Depot, Mackinlay Place Kilmarnock, KA1 3DN

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

GRIDBEYOND LIMITED CMU: GB2412 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Muller Milk & Ingredients Ltd, Stonebridge Cross, Hampton Lovett, Droitwich, WR9 0NX

On-Site Generating CMU

GRIDBEYOND LIMITED CMU: GBD020 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 4.18 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

LIMEJUMP LTD CMU: BAT002 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 1.73 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Pye Bridge Industrial Estate, Pye Bridge, Somercotes, Alfreton DE55 4NX

Gas fired peaking power plant

PYEBRIDGE POWER LTD CMU: MAPB24 Reciprocating engines CMU De-Rated N/A CMU DB: 7.28 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH

Lithium ion battery storage system capable of charging, storing and discharging electricity.

NEVENDON ENERGY STORAGE LTD CMU: NEV25B Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.26 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Strathallan Wind Farm Land at Greenscares Plantation Langside Road Braco Perth FK15 9LN

4x Enercon E70 E4 / 2300kW - curtailed to meet the grid connection export agreement of 8.000 MW.

ZEPHYRUS GREEN ENERGY LTD CMU: Strath Onshore Wind CMU De-Rated N/A CMU DB: 0.53 MW 2028-29 (T-4) Four Year Ahead Capacity Auction