Displaying 1 - 50 of 4 matching companies (Page 1 of 3)
Unit 1 fuelled by Biomass at Drax Power Station
Unit 2 fuelled by Biomass at Drax Power Station
Unit 3 fuelled by Biomass at Drax Power Station
Unit 4 fuelled by Biomass at Drax Power Station
Incineration of biomass to generate steam which drives a turbine.
Incineration of biomass to generate steam which drives a turbine.
Steam turbine supplied by boiler burning biomass.
Incineration of biomass to generate steam to drive steam turbine.
Thermal incineration of biomass to supply steam turbine.
Lynemouth Power Station Unit 1
Lynemouth Power Station Unit 2
Lynemouth Power Station Unit 3
Energy from Waste plant fuelled by biomass
Unit 1 fuelled by Biomass at Drax Power Station
Unit 2 fuelled by Biomass at Drax Power Station
Unit 3 fuelled by Biomass at Drax Power Station
Unit 4 fuelled by Biomass at Drax Power Station
Incineration of biomass to generate steam which drives a turbine.
Steam turbine supplied by boiler burning biomass.
Incineration of biomass to generate steam which drives a turbine.
Incineration of biomass to generate steam to drive steam turbine.
Thermal incineration of biomass to supply steam turbine.
Lynemouth Power Station Unit 1
Lynemouth Power Station Unit 2
Lynemouth Power Station Unit 3
Energy from Waste plant fuelled by biomass
Energy from Waste plant fuelled by biomass
A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. …
This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington …
This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …
This new CMU identifier is the replacement of LINC01 due to change in the Connection Capacity to Grid Connection Capacity as per rule 3.5.2. FCC Environment Lincolnshire Ltd, 150kT Energy …
This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 …
Longannet coal fired power station - Unit 1
Longannet coal fired power station - Unit 2
Longannet coal fired power station - Unit 3
Longannet coal fired power station - Unit 4
Existing Energy from Waste Plant
Existing Energy from Waste Plant
Existing Energy from Waste Plant
Existing Energy from Waste Plant
Existing Energy from Waste Plant
Generating Unit 4 at the Drax Power Station with BSC ID T_DRAXX-4.
2 stream Municipal waste incinerator: Total installed capacity 7.3MW, DNC 6.2MW
Aux. load separately metered
Unit 4
Energy from Waste Facility
Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.
2 stream municipal waste incinerator
Existing generation unit.
West Burton A Power Station CMU 3 WA3-17 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)