Capacity Market Search

Displaying 1 - 50 of 12 matching companies (Page 1 of 127)

Component Results (6336)

Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

FCC BUCKINGHAMSHIRE LIMITED CMU: BUCK02 Energy from Waste CMU De-Rated N/A CMU DB: 23.94 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW

New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant …

FCC Recycling (UK) Limited CMU: LINC01 Energy from Waste CMU De-Rated N/A CMU DB: 11.53 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB"

This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 …

MERCIA WASTE MANAGEMENT LIMITED CMU: MERC02 Energy from Waste CMU De-Rated N/A CMU DB: 17.27 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK

Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd …

Nuclear Decommissioning Authority CMU: NDAMAN Hydro CMU De-Rated N/A CMU DB: 27.30 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
10 Queens Drive , Kilmarnock, KA1 3XF

Load curtailment from refridgeration

LIMEJUMP LTD CMU: DSR_10 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Plot 168, Block D, Unit 11 Greenwood Way OX11 6DL

Load curtailment from refridgeration

LIMEJUMP LTD CMU: DSR_11 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
The Bridge Shopping Centre 11 Somers Road North PO1 1SL

Load curtailment from refridgeration

LIMEJUMP LTD CMU: DSR_11 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Cranbrook CHP1, Honiton Road, Cranbrook, Exeter, EX5 2DX

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered separately to the CHP

Waterswallows Energy Limited CMU: WATERS Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 0.54 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP

Waterswallows Energy Limited CMU: WATERS Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 1.39 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Viking Link Ltd, Bicker Fen Converter Station, Northorpe Road, Donington SPALDING PE11 4XY

Viking Link is a HVDC interconnector between GB and Danish transmission systems. Viking Link involved the construction of two converter stations, sited in GB and Denmark. At the converter stations, …

Waterswallows Energy Limited CMU: WATERS VikingLink (Denmark) CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Runcorn Site HQ, South Parade, PO Box9, Runcorn, Cheshire, WA7 4LT

CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand …

INOVYN CHLORVINYLS LIMITED CMU: INO200 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

CONRAD (LILLYHALL) LIMITED CMU: Lilly5 Reciprocating engines CMU De-Rated N/A CMU DB: 7.01 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 1 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.

Plutus Energy LTD CMU: SELBY_ Open Cycle Gas Turbine (OCGT) CMU De-Rated N/A CMU DB: 28.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.

Plutus Energy LTD CMU: SELBY_ Open Cycle Gas Turbine (OCGT) CMU De-Rated N/A CMU DB: 28.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.

Plutus Energy LTD CMU: SELBY_ Open Cycle Gas Turbine (OCGT) CMU De-Rated N/A CMU DB: 28.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 2 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 3 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 4 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.

Plutus Energy LTD CMU: SELBY_ Coal CMU De-Rated N/A CMU DB: 0.00 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Drax, Selby, YO8 8PH

This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.

Plutus Energy LTD CMU: SELBY_ Coal CMU De-Rated N/A CMU DB: 0.00 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Olympia Mills, Barlby Rd, Selby YO8 5AF, United Kingdom

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Plutus Energy LTD CMU: SELBY_ DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD

New Build Battery Storage Facility

Plutus Energy LTD CMU: SELBY_ Storage (Duration 4h) CMU De-Rated N/A CMU DB: 16.70 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Selby, North Yorkshire, YO8 6PG

A 40MW Distribution Connected Battery Energy Storage System

Plutus Energy LTD CMU: SELBY_ Storage (Duration 4h) CMU De-Rated N/A CMU DB: 16.70 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.05 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.21 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Selby, North Yorkshire, YO8 6PG

A Distribution Connected Battery Energy Storage System

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 8.38 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

GRIDBEYOND LIMITED CMU: GBD009 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 30.97 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Dairy Lane Westhamnett Chichester PO20 2BG

4MW battery co-located with a solar farm

E.ON UK PLC CMU: DSR012 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
BATTERSEA POWER STATION BATTERSEA POWER STATION LONDON LONDON SW11 8AH

Combined Heat and Power District Heating Plant at Battersea Power Station is made up of 2 CHPs totalling 4MW. The generator sizes have been inserted pro rata to achieve the …

LIMEJUMP LTD CMU: BAT001 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 1.73 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Sellindge substation, Church Lane, Aldington, Ashford, TN25 6SS

ElecLink has a transmission capacity of 1000MW corresponding to its grid connection agreements and link the 400kV AC grids of France and Great Britain. ElecLink employs voltage direct current converter …

ELECLINK LIMITED CMU: ElecL1 Eleclink (France) CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL

Hamms Hall - Existing Site CHP

GRIDBEYOND LIMITED CMU: GBD013 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 1.18 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS

Poole Existing Site CHP

GRIDBEYOND LIMITED CMU: GBD013 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 1.13 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP

Warrington Existing Site CHP

GRIDBEYOND LIMITED CMU: GBD013 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 0.88 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Weir Minerals, Halifax Rd, Todmorden OL14 5RT, United Kingdom

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

GRIDBEYOND LIMITED CMU: GBD027 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX

New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included …

FCC (E&M) LIMITED CMU: MILL01 Energy from Waste CMU De-Rated N/A CMU DB: 13.21 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
HSH - Grimsby - Site 1 Birchin Way, Grimsby DN31 2SG, United Kingdom

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

GRIDBEYOND LIMITED CMU: GBD014 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
HSH - Grimsby - Site 2 Birchin Way, Grimsby DN31 2SG, United Kingdom

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

GRIDBEYOND LIMITED CMU: GBD014 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
HSH - Redditch Moons Moat Dr, Moons Moat North Industrial Estate, Redditch B98 9DY, United Kingdom

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

GRIDBEYOND LIMITED CMU: GBD014 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
XPO Lowestoft Mobbs Way, Lowestoft NR32 3BN, United Kingdom

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

GRIDBEYOND LIMITED CMU: GBD014 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction