Capacity Market Search

Displaying 1 - 50 of 5 matching companies (Page 1 of 151)

Component Results (7549)

Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

FCC BUCKINGHAMSHIRE LIMITED CMU: BUCK02 Energy from Waste CMU De-Rated N/A CMU DB: 23.94 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

GRIDBEYOND LIMITED CMU: END004 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Park Farm Barn, Chichester Rd, Selsey, Chichester PO20 9HP, United Kingdom

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

GRIDBEYOND LIMITED CMU: END004 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW

New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant …

FCC Recycling (UK) Limited CMU: LINC01 Energy from Waste CMU De-Rated N/A CMU DB: 11.53 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB"

This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 …

MERCIA WASTE MANAGEMENT LIMITED CMU: MERC02 Energy from Waste CMU De-Rated N/A CMU DB: 17.27 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK

Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd …

Nuclear Decommissioning Authority CMU: NDAMAN Hydro CMU De-Rated N/A CMU DB: 27.30 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
10 Queens Drive , Kilmarnock, KA1 3XF

Load curtailment from refridgeration

LIMEJUMP LTD CMU: DSR_10 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Plot 168, Block D, Unit 11 Greenwood Way OX11 6DL

Load curtailment from refridgeration

LIMEJUMP LTD CMU: DSR_11 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
The Bridge Shopping Centre 11 Somers Road North PO1 1SL

Load curtailment from refridgeration

LIMEJUMP LTD CMU: DSR_11 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Scroby Sands Wind Farm, Admiralty Road, Great Yarmouth, NR30 3NS

Offshore wind farm

E.ON UK Plc CMU: SAND-1 Offshore Wind CMU De-Rated N/A CMU DB: 5.79 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Biogas Technology Limited CMU: SUTT22 Reciprocating engines CMU De-Rated N/A CMU DB: 2.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Viking Link Ltd, Bicker Fen Converter Station, Northorpe Road, Donington SPALDING PE11 4XY

Viking Link is a HVDC interconnector between GB and Danish transmission systems. Viking Link involved the construction of two converter stations, sited in GB and Denmark. At the converter stations, …

Waterswallows Energy Limited CMU: WATERS VikingLink (Denmark) CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Douglas Water Hydroelectric Generating Station, near Inveraray, Argyll, PA32 8XT

Hydroelectric run of river power station

Waterswallows Energy Limited CMU: WATERS Hydro CMU De-Rated N/A CMU DB: 2.73 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ

Water source heat pumps at 1748kW each

Waterswallows Energy Limited CMU: WATERS DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG

Water source heat pump at 1883kW each

Waterswallows Energy Limited CMU: WATERS DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG

Water source heat pumps at 1748kW each

Waterswallows Energy Limited CMU: WATERS DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Ashgrove Road West, Aberdeen AB16 5UL

District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.

FLEXITRICITY LIMITED CMU: F18024 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 0.92 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Runcorn Site HQ, South Parade, PO Box9, Runcorn, Cheshire, WA7 4LT

CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand …

INOVYN CHLORVINYLS LIMITED CMU: INO200 DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Braes of Doune Wind Farm, Milton of Cambus, Nr Doune,FK16 6HG

36-turbine wind farm in Doune with a connection capacity of 74.000 MW

P3P Partners LLP CMU: MILTON Onshore Wind CMU De-Rated N/A CMU DB: 4.91 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 1 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-9G.

Plutus Energy LTD CMU: SELBY_ Open Cycle Gas Turbine (OCGT) CMU De-Rated N/A CMU DB: 28.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.

Plutus Energy LTD CMU: SELBY_ Open Cycle Gas Turbine (OCGT) CMU De-Rated N/A CMU DB: 28.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.

Plutus Energy LTD CMU: SELBY_ Open Cycle Gas Turbine (OCGT) CMU De-Rated N/A CMU DB: 28.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 2 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 3 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station Drax Selby YO8 8PH

Unit 4 fuelled by Biomass at Drax Power Station

Plutus Energy LTD CMU: SELBY_ Biomass CMU De-Rated N/A CMU DB: 559.51 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Selby, North Yorkshire, YO8 8PH

A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.

Plutus Energy LTD CMU: SELBY_ Coal CMU De-Rated N/A CMU DB: 0.00 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Drax Power Station, Drax, Selby, YO8 8PH

This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.

Plutus Energy LTD CMU: SELBY_ Coal CMU De-Rated N/A CMU DB: 0.00 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Olympia Mills, Barlby Rd, Selby YO8 5AF, United Kingdom

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Plutus Energy LTD CMU: SELBY_ DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD

New Build Battery Storage Facility

Plutus Energy LTD CMU: SELBY_ Storage (Duration 4h) CMU De-Rated N/A CMU DB: 16.70 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Selby, North Yorkshire, YO8 6PG

A 40MW Distribution Connected Battery Energy Storage System

Plutus Energy LTD CMU: SELBY_ Storage (Duration 4h) CMU De-Rated N/A CMU DB: 16.70 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.05 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.21 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at The Magazine, Hull Road, Selby, YO8 5BJ

Battery energy storage unit

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.42 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Selby, North Yorkshire, YO8 6PG

A Distribution Connected Battery Energy Storage System

Plutus Energy LTD CMU: SELBY_ Storage (Duration 2h) CMU De-Rated N/A CMU DB: 8.38 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

GRIDBEYOND LIMITED CMU: GBD009 Combined Heat and Power (CHP) CMU De-Rated N/A CMU DB: 30.97 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
St Andrews Road, Kings Weston Lane BS11 9FG

Load curtailment from refridgeration

SSE ENERGY SUPPLY LIMITED CMU: WESTON DSR CMU De-Rated N/A 2028-29 (T-4) Four Year Ahead Capacity Auction
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD

CMU comprising of battery storage and associated plant

SSE ENERGY SUPPLY LIMITED CMU: WESTON Storage (Duration 1h) CMU De-Rated N/A CMU DB: 3.31 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Warne Road, Weston Super-Mare, BS23 9JZ

New-build gas reciprocating engine.

SSE ENERGY SUPPLY LIMITED CMU: WESTON Reciprocating engines CMU De-Rated N/A CMU DB: 18.98 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land North of Clayhill Farm, Westoning MK45 5JD

Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

SSE ENERGY SUPPLY LIMITED CMU: WESTON Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.05 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
C35, Castle Douglas , Scotland, DG7 3UF

12-turbine wind farm located in Scotland with the installed capacity of 43.200MW

ENERSYST LIMITED CMU: Castle Onshore Wind CMU De-Rated N/A CMU DB: 2.84 MW 2028-29 (T-4) Four Year Ahead Capacity Auction