Capacity Market Search

Displaying items 1 - 2 of 2 matching components

Component Results (2)

Netherton Farm, Keith AB55 5PE

200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.

ZENOBE BLACKHILLOCK LIMITED CMU: NBBLK4 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 27.15 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Netherton Farm, Keith AB55 5PE

200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's

ZENOBE BLACKHILLOCK LIMITED CMU: NBBLK4 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 27.15 MW 2025-26 (T-1) One Year Ahead Capacity Auction