Capacity Market Search

Displaying items 1 - 1 of 1 matching components

Component Results (1)

Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPNP23 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 7.91 MW 2027-28 (T-4) Four Year Ahead Capacity Auction