Capacity Market Search

Displaying 1 - 3 of 1 matching companies

Component Results (3)

Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN001 Storage (Duration 1h) CMU De-Rated N/A 2023-24 (T-4) Four Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN001 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN001 Storage (Duration 1h) CMU De-Rated N/A 2020-21 (T-1) One Year Ahead Capacity Auction