CMU 5RES-4

10 unique locations - 6.4MW total capacity

Southdownview Way, Worthing, West Sussex, BN14 8QH (14 components)
• CHP and autogeneration
• DSR component providing load turn-down at a paper product manufacturing site
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
6.35 MW
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (9 components)
• Gas fired CHP unit
• Hungry Snout Water Pumping Station
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Muiresk RWP Muiresk Turriff Aberdeenshire AB53 4HD (2 components)

Muiresk Water Pumping Station

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Harmire Road, Barnard Castle, County Durham, DL12 8DT (22 components)
• Component has yet to be procured.
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (10 components)
• Distribution centre with behind the meter back up generation
• Load reduction on site supported by non-exporting standby generation.
• On-site existing CHP generating unit
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
6.35 MW
British Gas, New Bridge Ln, Stockport, SK1 2GT (15 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site.
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
Active • 2025-26 (T-4), 2024-25 (T-4) ...
9.43 MW
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (42 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• On-site existing CHP generating unit
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1 Waterfront Avenue, Edinburgh, EH5 1SG (25 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
0.81 MW
195 Aylesone Rd, Leicester LE2 7QJ (29 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...