Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU SELBY_

16 unique locations - 18.9MW total capacity

54.62 MW
Carr Street Selby YO8 8AW (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2021-22 (T-4)
Drax Power Station Drax Selby YO8 8PH (5 components)
• Unit 1 fuelled by Biomass at Drax Power Station
• Unit 2 fuelled by Biomass at Drax Power Station
• Unit 3 fuelled by Biomass at Drax Power Station
Active • 2028-29 (T-4), 2021-22 (T-4)
2238.05 MW
Grimethorpe CMM Generation Plant, Springvale Road, Grimethorpe S72 7BF (6 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
J3 Business Park Balby Carr End Doncaster DN4 8DE (3 components)
• 10 MW Storage facility
• 10 MW Storage facility located at Balby, Doncaster.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
• A new build 29MW battery energy storage system
• A new build 30MW battery energy storage system
• CMU consisting of multiple reciprocating engines and alternators
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.78 MW
Land Off Ash Road, Elton, Chester, CH2 4LB (11 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Land on Dalmarnock Road Trading Estate, Rutherglen, G73 1AN. See map uploaded. (3 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2022-23 (T-3), 2021-22 (T-4) ...
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (4 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Lochaber Smelter Fort William Scotland PH33 6TH (12 components)
• Furnace
• Furnaces
Active • 2025-26 (T-1), 2024-25 (T-1) ...
30.00 MW
Loading map...
Showing 10 locations