Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ETP-QQR ENERGY LIMITED

9 unique locations (12 components)

Active MW: 8.38 MW
Inactive MW: 0.00 MW
Abbey Home Farm, Burford Road, Cirencester, GL7 5HF (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Abbey Not Prequalified GL7
Active • 2025-26 (T-4)
Beeston Park Farm, Ridge End Fold, Marple, Stockport, SK6 7EX (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Beeston Not Prequalified SK6
Active • 2025-26 (T-4)
Catridge Farm, Wick Lane, Lacock, Chippenham, SN15 2LU (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Cartridge Not Prequalified SN15
Active • 2025-26 (T-4)
Chinley House Farm, Dolly Lane, High Peak, Stockport, SK23 7NP (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Chinley Farm Not Prequalified SK23
Active • 2025-26 (T-4)
Goyt Hall Farm, Dark Lane, Romiley, Stockport SK6 3LH (2 components)
• A Battery Energy Storage System
• A distribution connected Battery Energy Storage System
Storage (Duration 2h) GOYT HALL PROJECT COMPANY LTD ETP-QQR ENERGY LIMITED New Build Generating CMU Goyt Farm Goyt Hall SK6
Active • 2028-29 (T-4), 2025-26 (T-4)
Hamble Lane, Old Netley, Southampton, SO31 5FT (2 components)

A Battery Energy Storage System

Storage (Duration 1h) Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Hamble Hamble2 Not Prequalified SO31
Active • 2025-26 (T-4)
Mill Hill Farm, Hazel Grove, SK12 1EG (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Bramhall Not Prequalified SK12
Active • 2025-26 (T-4)
Mill Hill Farm, Woodend Road, Poynton, SK12 1EG (2 components)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Hazel Grove Poynton Battery Rejected SK12
Active • 2025-26 (T-4)
Overlea Farm , New Mills, High Peak, Stockport SK22 4QJ (1 component)

A Battery Energy Storage System

Storage (Duration 2h) ETP-QQR ENERGY LIMITED New Build Generating CMU Overlea Not Prequalified SK22
Active • 2025-26 (T-4)
Loading map...
Showing 9 locations