FLEXITRICITY LIMITED

32 unique locations (994 components) - Page 1 of 2

Active MW: 154.09 MW
Inactive MW: 0.00 MW
9 Handyside St, Kings Cross, London N1C 4BH (12 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2026-27 (T-1) ...
Ashgrove Road West, Aberdeen AB16 5UL (14 components)
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• District heating implementation with one asset 1.063MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. Historic Average Output is 525.009kW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Beach Esplanade, Aberdeen AB24 5NR (10 components)
• District heating implementation with one asset 1.063MW and no auxiliary load. Historic Average Output is 855.251kW.
• District heating implementation with one asset 1MW and no auxiliary load
Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected AB24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Bowland View, Fulwood, Preston Lancashire PR2 5QT (9 components)
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
• Standby generation
DSR FLEXITRICITY LIMITED Unproven DSR CMU PR2
Active • 2029-30 (T-4), 2028-29 (T-4) ...
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (6 components)

Load reduction on site supported by non-exporting standby generation.

DSR FLEXITRICITY LIMITED Proven DSR CMU Ledi Ledi +2 more S33
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Bush Estate Penicuik EH26 0QA (11 components)
• Load reduction on site supported by non-exporting standby generation.
• Load reduction on site supported by standby generation
• Load reduction on site supported by standby generation.
• ... and 2 more unique descriptions
DSR FLEXITRICITY LIMITED Unproven DSR CMU FLEX75 EH26
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Deansford Lane, DY10 4NB (12 components)

Load reduction on site supported by non-exporting standby generation.

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX73 FLEX73 +7 more DY10
Active • 2029-30 (T-4), 2028-29 (T-4) ...
EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (7 components)

Load reduction on site supported by non-exporting standby generation.

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX73 FLEX73 +3 more WR12
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (11 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (17 components)
• Air compression unit (ACU) that can turn off in response to CM requirements, curtailing load at site (DSR: load curtailment)
• load curtailment at site
DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX67 FLEX67 +8 more OX11
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (9 components)
• Water source Heat Pumps at 1883KW each
• Water source Heat Pumps at 1883KW each - located at Horticultural site
• Water source heat pump at 1883kW each
DSR FLEXITRICITY LIMITED Proven DSR CMU Conival FLEX162 +1 more RG40
Active • 2029-30 (T-4), 2028-29 (T-4) ...
High Street, Waterham, nr Faversham, Kent ME13 9EJ (11 components)
• 6 CHP engines horticultural environment with no auxiliiary load
• Two of six CHP engines horticultural environment with no auxiliiary load
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX01 FLEX01 +3 more ME13
Active • 2027-28 (T-4), 2026-27 (T-1) ...
Joan Ln, Bamford, Hope Valley S33 0AW (7 components)

Load reduction on site supported by non-exporting standby generation.

DSR FLEXITRICITY LIMITED Proven DSR CMU Ledi Ledi +4 more S33
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (14 components)
• Gas CHP engine in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load.
• One asset 2.0MW CHP engine in a horticultural environment with no auxilliary load. Primary fuel type = Natural Gas
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX109 FLEX149 +3 more L40
Active • 2027-28 (T-4), 2026-27 (T-4) ...
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (12 components)

Load reduction on site supported by non-exporting standby generation.

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX73 FLEX73 +7 more ST13
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Manchester Rd, Carrington, Manchester M31 4TG (16 components)
• Air compression unit (ACU) that can turn off in response to CM requirements, curtailing load at site (DSR: load curtailment)
• load curtailment at site
DSR FLEXITRICITY LIMITED Proven DSR CMU Carnoustie FLEX66 +8 more M31
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Meerbrook, Leek, Staffordshire, ST13 8SN (9 components)

Load reduction on site supported by non-exporting standby generation.

DSR FLEXITRICITY LIMITED Proven DSR CMU Ledi Ledi +5 more ST13
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Montgomery Road, Aberdeen AB24 2YA (14 components)
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
• District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. Historic Average Output is 989.810kW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Mythe Road. Tewkesbury. Gloucester. GL20 6AA (12 components)

Load reduction on site supported by non-exporting standby generation.

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX73 FLEX73 +7 more GL20
Active • 2029-30 (T-4), 2028-29 (T-4) ...
n/a (618 components) Geocoding Needed
• Batteries behind the meter at industrial/commercial sites
• Battery situated behind-the-meter with demand at a commercial site
• Behind the meter battery at industrial/commercial site
• ... and 29 more unique descriptions
DSR SSE ENERGY SUPPLY LIMITED Unproven DSR CMU SSE DSR Unit 2 SSE DSR Unit 3 +3 more
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Neachley Ln, Shifnal TF11 8PQ (12 components)

Load reduction on site supported by non-exporting standby generation.

DSR FLEXITRICITY LIMITED Proven DSR CMU FLEX73 FLEX73 +7 more TF11
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Northmoor Lane, Cottingham, Hull HU16 4JN (6 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2028-29 (T-4), 2027-28 (T-4) ...
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (20 components)
• CHP at a horticultural environment.
• CHP at horticultural site
• Gas CHP engines in commercial horticultural environment with no auxilliary load
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX08 FLEX08 +3 more HU16
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (33 components)
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
Roundswell Business Park, Barnstaple, Devon EX31 3TD (6 components)

Front of the Meter battery storage asset located in Devon.

Storage (Duration 1h) FLEXITRICITY LIMITED Existing Generating CMU FLEX158 EX31
Active • 2029-30 (T-4), 2028-29 (T-4) ...