Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OHME OPERATIONS UK LIMITED

212 unique locations (1293 components) - Page 1 of 9

Active MW: 39.94 MW
Inactive MW: 0.00 MW
AB23 (4 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
B16 (5 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
B17 (9 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
B24 8BH (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
B36 (11 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
B37 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
B43 (6 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-4) ...
39.94 MW
B44 (10 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
B45 9DJ (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
B6 (3 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1)
39.94 MW
B64 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
39.94 MW
B71 (10 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2027-28 (T-4), 2025-26 (T-4) ...
39.94 MW
BB10 (8 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
DSR EV Charging LEVELISE LIMITED Balancing Reserve BB10
Active • 2027-28 (T-4), 2025-26 (T-4) ...
39.94 MW
BB11 (7 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-4) ...
39.94 MW
BB9 (12 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2025-26 (T-4) ...
39.94 MW
BD11 (12 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
BD13 2JD (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
BD8 (4 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2024-25 (T-4) ...
39.94 MW
BH11 9FZ (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
BH23 2ER (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
BL2 (7 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
BL4 (12 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
BN2 5ED (1 component)

Domestic EV charge point

Active • 2025-26 (T-1)
39.94 MW
BS13 (11 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
BS27 (8 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
39.94 MW
Loading map...
Showing 25 locations