Components Ranked by De-rated Capacity
Displaying 1-2 of 2 components with capacity data.
-
Storage (Duration 1h)
This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).
-
Storage (Duration 1.5h)
This is an Existing Generation CMU with 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storag…