Land at Hall Farm, Northwold, Thetford, IP26 5LQ
Storage (Duration 1h)
- 7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a …
1.02 MW
CMU: NSFL01
2025-26 (T-1)
Land at Hall Farm, Northwold, Thetford, IP26 5LQ
Storage (Duration 1h)
- 7.5MW, 1-hour duration battery energy storage system (BESS). BESS is being constructed alongside a …
0.79 MW
CMU: NSFL01
2028-29 (T-4)