Sutton Bridge Power Generation
Back to Search
All Components
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
All Components for Sutton Bridge Power Generation
Found 16 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 1-16 of 16.
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
CMU: SUTB-1
2022-23 (T-3)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
CMU: SUTB-1
2023-24 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
CMU: SUTB-1
2022-23 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
CMU: SUTB-1
2028-29 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
CMU: SUTB-1
2026-27 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
CMU: SUTB-1
2027-28 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
CMU: SUTB-1
2025-26 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
CMU: SUTB-1
2024-25 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
CMU: SUTB-1
2021-22 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
CMU: SUTB-1
2024-25 (T-1)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT
773.08 MW
CMU: SUTB-1
2025-26 (T-1)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Existing CCGT to be refurbished
CMU: SUTB-1
2028-29 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
None
- Existing CCGT
CMU: SUTB1Z
2020-21 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
None
- Existing CCGT
CMU: SUTB1Z
2017-18 (T-1)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combin…
CMU: 23SB01
2027-28 (T-4)
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF
Combined Cycle Gas Turbine (CCGT)
- Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combin…
CMU: 23SB01
2025-26 (T-4)
Data fetch time: 0.272s