All Components for THE ISLE OF WIGHT ENERGY COMPANY LIMITED
Found 37 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 1-37 of 37.
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR
DSR
- Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
CMU: IWHALI
2024-25 (T-1)
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR
DSR
- Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
CMU: IWHALI
2024-25 (T-1)
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR
DSR
- Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
CMU: IWHALI
2027-28 (T-4)
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR
DSR
- Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
CMU: IWHALI
2028-29 (T-4)
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR
DSR
- Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
CMU: IWHALI
2027-28 (T-4)
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR
DSR
- Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
CMU: IWHALI
2024-25 (T-1)
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR
DSR
- Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
CMU: IWHALI
2027-28 (T-4)
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR
DSR
- Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
CMU: IWHALI
2028-29 (T-4)
Arreton Valley Nursery, Hale common, Arreton, Isle of Wight, PO30 3AR
DSR
- Industrial flexible demand used for manufacturing processes and remotely controlled via SCADA.
CMU: IWHALI
2028-29 (T-4)
Arreton Valley Nusery, Hale Common, Arreton, Newport, Isle of Wight, PO30 3AR
Storage (Duration 1h)
- The CMU component will have a connection capacity of 2.52MW. BYD Battery
0.20 MW
CMU: ARRE23
2027-28 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
None
- The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine deliverin…
CMU: MAIN16
2020-21 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
None
- The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine deliverin…
CMU: MAIN16
2020-21 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
None
- The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine deliverin…
CMU: MAIN16
2020-21 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
None
- The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine deliverin…
CMU: MAIN16
2017-18 (T-1)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
None
- The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine deliverin…
CMU: MAIN16
2017-18 (T-1)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
None
- The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine deliverin…
CMU: MAIN16
2017-18 (T-1)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
Combined Heat and Power (CHP)
- The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN18
2022-23 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
Combined Heat and Power (CHP)
- The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN18
2022-23 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
Combined Heat and Power (CHP)
- The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN18
2022-23 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
Combined Heat and Power (CHP)
- The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN18
2019-20 (T-1)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
Combined Heat and Power (CHP)
- The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN18
2019-20 (T-1)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
Combined Heat and Power (CHP)
- The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN18
2019-20 (T-1)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
CHP and autogeneration
- The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN17
2021-22 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
CHP and autogeneration
- The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN17
2021-22 (T-4)
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO3…
CHP and autogeneration
- The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN17
2021-22 (T-4)
Scotia Road Business Park, Tunstall, Stoke on Trent, ST6 4HG
Storage (Duration 1h)
- The CMU component will have a connection capacity of 2.5MW. BYD Battery
0.30 MW
CMU: STOK22
2026-27 (T-4)
Tees Valley Nursery, The Moat, Billingham, TS23 4ED
DSR
- Industrial load that is independently metered and controllable via SCADA. Load can be operated for …
CMU: IWTSLI
2024-25 (T-1)
Tees Valley Nursery, The Moat, Billingham, TS23 4ED
DSR
- Industrial load that is independently metered and controllable via SCADA. Load can be operated for …
CMU: IWTSLI
2027-28 (T-4)
Tees Valley Nursery, The Moat, Billingham, TS23 4ED
DSR
- Industrial load that is independently metered and controllable via SCADA. Load can be operated for …
CMU: IWTSLI
2028-29 (T-4)
Wight Salads Arreton Newport Isle of Wight PO30 3AR
Combined Heat and Power (CHP)
- The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be th…
CMU: MAIN21
2023-24 (T-1)
Wight Salads Arreton Newport Isle of Wight PO30 3AR
Combined Heat and Power (CHP)
- The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be th…
CMU: MAIN21
2022-23 (T-1)
Wight Salads Arreton Newport Isle of Wight PO30 3AR
Combined Heat and Power (CHP)
- The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be th…
CMU: MAIN22
2022-23 (T-3)
Wight Salads Arreton Newport Isle of Wight PO30 3AR
Combined Heat and Power (CHP)
- The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be th…
CMU: MAIN22
2023-24 (T-4)
Wight Salads Arreton Newport Isle of Wight PO30 3AR
Combined Heat and Power (CHP)
- The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be th…
CMU: MAIN24
2024-25 (T-4)
Wright Street, Paisley, Renfrew, PA4 8AN
Storage (Duration 2h)
- Battery Energy Storage, 49.990 MW installed for a 2hr system.
10.47 MW
CMU: GABL24
2028-29 (T-4)
None
None
- The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN18
2019-20 (T-4)
None
None
- The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but der…
CMU: MAIN18
2019-20 (T-4)