THRIVE RENEWABLES (WICKEN) LIMITED
Back to Search
All Components
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
All Components for THRIVE RENEWABLES (WICKEN) LIMITED
Found 9 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 1-9 of 9.
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
Storage (Duration 1h)
- A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an …
CMU: WKN001
2023-24 (T-4)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
Storage (Duration 1h)
- A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an …
CMU: WKN001
2022-23 (T-3)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
Storage (Duration 1h)
- A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an …
CMU: WKN001
2020-21 (T-1)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
Storage (Duration 1h)
- A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to a…
CMU: WKN002
2024-25 (T-1)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
Storage (Duration 1h)
- A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to a…
CMU: WKN002
2023-24 (T-1)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
Storage (Duration 1.5h)
- A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to a…
CMU: WKN002
2022-23 (T-1)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
Storage (Duration 1.5h)
- A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to a…
CMU: WKN002
2024-25 (T-4)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
Storage (Duration 1.5h)
- A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to a…
CMU: WKN002
2021-22 (T-1)
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS
Storage (Duration 1h)
- A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to a…
0.57 MW
CMU: WKN002
2026-27 (T-4)
Data fetch time: 1.051s