Willington Power Limited
Back to Search
All Components
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
All Components for Willington Power Limited
Found 38 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 1-38 of 38.
BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9
DSR
- EV charging at residential premises
CMU: WILL_C
2026-27 (T-4)
BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9
DSR
- EV charging at residential premises
CMU: WILL_C
2027-28 (T-4)
BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9
DSR
- EV charging at residential premises
CMU: WILL_C
2024-25 (T-1)
BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9
DSR
- EV charging at residential premises
CMU: WILL_C
2023-24 (T-1)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE
BritNED (Netherlands)
- BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission system…
CMU: WILL_C
2024-25 (T-4)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE
BritNED (Netherlands)
- BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission system…
CMU: WILL_C
2022-23 (T-4)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE
BritNED (Netherlands)
- BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission system…
CMU: WILL_C
2025-26 (T-4)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE
BritNED (Netherlands)
- BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission system…
CMU: WILL_C
2026-27 (T-4)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE
BritNED (Netherlands)
- BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission system…
CMU: WILL_C
2023-24 (T-4)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE
BritNED (Netherlands)
- BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission system…
CMU: WILL_C
2022-23 (T-3)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE
BritNED (Netherlands)
- BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission system…
CMU: WILL_C
2027-28 (T-4)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE
BritNED (Netherlands)
- BritNed is a electricity interconnector connecting the electricity transmission systems in the Neth…
CMU: WILL_C
2028-29 (T-4)
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB
Reciprocating engines
- CMU consisting of multiple reciprocating engines and alternators
CMU: WILL_C
2023-24 (T-1)
P & C Attfield Lodge Farm Countesthorpe Road Whetstone, Leicestershire LE8 6LD
Reciprocating engines
- New build power station comprised of multiple reciprocating engines.
CMU: WILL_C
2022-23 (T-4)
P & C Attfield Lodge Farm Countesthorpe Road Whetstone, Leicestershire LE8 6LD
Reciprocating engines
- New build power station comprised of multiple reciprocating engines.
CMU: WILL_C
2022-23 (T-4)
Plot C Land at Severn Road Avonmouth BS10 7SE
Storage (Duration 1h)
- The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy S…
CMU: WILL_C
2023-24 (T-4)
Plot C Land at Severn Road Avonmouth BS10 7SE
Storage (Duration 1h)
- The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy S…
CMU: WILL_C
2023-24 (T-4)
Plot C Land at Severn Road Avonmouth BS10 7SE
Storage (Duration 1h)
- The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy S…
CMU: WILL_C
2023-24 (T-4)
Plot C Land at Severn Road Avonmouth BS10 7SE
Storage (Duration 1h)
- The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy S…
CMU: WILL_C
2022-23 (T-4)
Plot C, Land at Severn Road Avonmouth BS10 7SE
Storage (Duration 2h)
- Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity f…
4.73 MW
CMU: WILL_C
2026-27 (T-4)
Plot C, Land at Severn Road Avonmouth BS10 7SE
Storage (Duration 2h)
- Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity f…
10.77 MW
CMU: WILL_C
2027-28 (T-4)
Plot C, Land at Severn Road Avonmouth BS10 7SE
Storage (Duration 2h)
- Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity f…
11.82 MW
CMU: WILL_C
2026-27 (T-4)
SHED BARN C NORTH ROAD ABINGTON CAMBRIDGESHIRE CB21
DSR
- EV charging at residential premises
CMU: WILL_C
2026-27 (T-4)
SHED BARN C NORTH ROAD ABINGTON CAMBRIDGESHIRE CB21
DSR
- EV charging at residential premises
CMU: WILL_C
2027-28 (T-4)
SHED BARN C NORTH ROAD ABINGTON CAMBRIDGESHIRE CB21
DSR
- EV charging at residential premises
CMU: WILL_C
2024-25 (T-1)
SHED BARN C NORTH ROAD ABINGTON CAMBRIDGESHIRE CB21
DSR
- EV charging at residential premises
CMU: WILL_C
2023-24 (T-1)
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG
Reciprocating engines
- CMU consisting of multiple reciprocating engines and alternators
CMU: WILL_C
2025-26 (T-4)
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG
Reciprocating engines
- CMU consisting of multiple reciprocating engines and alternators
CMU: WILL_C
2023-24 (T-1)
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG
Reciprocating engines
- CMU consisting of multiple reciprocating engines and alternators
CMU: WILL_C
2022-23 (T-1)
UNITS A, B, C & D POSTLEY ROAD KEMPSTON BEDFORD MK42 7AG
Reciprocating engines
- CMU consisting of multiple gas reciprocating engines and alternators
CMU: WILL_C
2024-25 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP
None
- Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat rec…
CMU: WILL-C
2020-21 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP
None
- Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat rec…
CMU: WILL-C
2020-21 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP
Combined Cycle Gas Turbine (CCGT)
- Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat rec…
CMU: WILL_C
2021-22 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP
Combined Cycle Gas Turbine (CCGT)
- Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat rec…
CMU: WILL_C
2021-22 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP
Combined Cycle Gas Turbine (CCGT)
- Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat rec…
CMU: WILC22
2022-23 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP
Combined Cycle Gas Turbine (CCGT)
- Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat rec…
CMU: WILC22
2022-23 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP
Combined Cycle Gas Turbine (CCGT)
- Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat rec…
CMU: 23WC01
2023-24 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP
Combined Cycle Gas Turbine (CCGT)
- Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat rec…
CMU: 23WC01
2023-24 (T-4)
Data fetch time: 0.274s