Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...
GrokAI Overview

Search Results for "CH5 2LL"

9 unique locations (27 components) - Page 1 of 2

Sort by: Relevance A-Z Components MW Date
LAND AT WEIGHBRIDGE ROAD DEESIDE CH5 2LL (2 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Not Prequalified CH5
Inactive • 2021-22 (T-1), 2020-21 (T-1)
4.82 MW (CMU UR0039) (Historical)
(Estimated)
LAND AT WEIGHBRIDGE ROAD DEESIDE CH5 2LL (2 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Not Prequalified CH5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.82 MW (CMU UR0039) (Historical)
(Estimated)
Parc Adfer Energy Recovery Facility Deeside Industrial Park Deeside Flintshire CH5 2LL (1 component)

An energy from waste facility located in North Wales and designed to generate electricity

ENFINIUM PARC ADFER LIMITED New Build Generating CMU CH5
Inactive • 2020-21 (T-4)
14.78 MW (CMU ParcAd) (Historical)
(Estimated)
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (3 components)

19 MW of demand reduction

DSR LIMEJUMP LTD Proven DSR CMU CH5
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
16.37 MW (CMU DSR303) (Historical)
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->