{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "PA7 5NS"

5 unique locations (6 components)

Sort by: Relevance A-Z Components MW Date
Land off Shilton Lane & Old Greenock Road by the M898 near Erskine PA7 5NS (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV. This CMU is adjacent …

Storage FlexibleGridPower Ltd New Build Generating CMU Not Prequalified PA7
Inactive • 2021-22 (T-4), 2018-19 (T-1)
2.86 MW (CMU ESBS15) (Historical)
(Estimated)
Land off Shilton Lane & Old Greenock Road by the M898 near Erskine PA7 5NS. See map. (1 component)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Storage FlexibleGridPower Ltd New Build Generating CMU Not Prequalified PA7
Inactive • 2018-19 (T-1)
5.35 MW (CMU ESBS14) (Historical)
(Estimated)
Land off Shilton Lane & Old Greenock Road by the M898 near Erskine PA7 5NS. See map. (1 component)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

Storage FlexibleGridPower Ltd New Build Generating CMU Not Prequalified PA7
Inactive • 2021-22 (T-4)
5.35 MW (CMU ESBS14) (Historical)
(Estimated)
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS (2 components)

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; …

Storage (Duration 1h) ERSKINE ENERGY STORAGE LIMITED New Build Generating CMU Rejected PA7
Active • 2025-26 (T-4), 2022-23 (T-4)
5.97 MW (CMU EKCM21)
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->