{# MAP SEARCH SHARED STYLES WHY: Eliminates ~700 lines of duplicate CSS across map search templates Provides consistent styling for split-screen map layout, badges, and mobile interface HOW: Include in the extra_head block in map templates after Bootstrap Icons link TEMPLATES USING THIS: - search_company_map.html - search_technology_map.html - search_cmu_map.html UPDATED: 2025-01-30 #}
Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Search Results for "SN16 9DX"

6 unique locations (21 components) - Page 1 of 2

Sort by: Relevance A-Z Components MW Date
1, THE OLD BARN PURLIEUS, MINETY, MALMESBURY SN16 9RP (Nearest postcode to grid reference: SN16 9DX). (10 components)

Battery Storage Plant

Storage Storage (Duration 1h) Storage (Duration 2h) MINETY SOUTH STORAGE 2 LTD Existing Generating CMU New Build Generating CMU SN16
Active • 2025-26 (T-4), 2024-25 (T-1) ...
9.93 MW (CMU SEL095)
(Mixed)
Land adjacent Minety National Grid Substation. B4040, Nr Malmesbury, Wiltshire, SN16 9DX (2 components)

A Battery Energy Storage System.

Storage (Duration 5h) HB411MIN LTD New Build Generating CMU SN16
Active • 2028-29 (T-4)
49.72 MW (part of 49.72 MW aggregated CMU)
(Estimated)
Land Adjacent to Electricity Sub Station, Stonehill, Charlton, Malmesbury, Wiltshire, SN16 9DX (5 components)

49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire

Storage (Duration 1h) LOWER MINETY ENERGY LIMITED Existing Generating CMU New Build Generating CMU SN16
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
10.20 MW (CMU LMES01) (Historical)
(Estimated)
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 component)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage (Duration 1h) Lower Minety Energy Limited New Build Generating CMU Conditional SN16
Inactive • 2022-23 (T-4)
14.67 MW (CMU LOMIN1) (Historical)
(Estimated)
Land Near Minety Substation, Minety, Wiltshire, SN16 9DX (1 component)

Battery Storage

Active • 2027-28 (T-4)
4.39 MW (CMU MINE23)
(Estimated)
Loading map...
<\!-- Shared Category Filter JavaScript -->