37 unique locations (121 components) - Page 1 of 2

Active MW: 51.47 MW
Inactive MW: 1248.93 MW
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (4 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Battery Storage Storage (Duration 0.5h) CLEATOR BATTERY STORAGE LIMITED New Build Generating CMU Cleator Storage Cleator Storage +1 more CA22
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
13.51 MW
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (3 components) Geocoding Needed
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
7.95 MW
Weights Farm,Weights Lane,Redditch,B97 6RG (2 components)

4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery (2)

Battery Storage LIMEJUMP LTD New Build Generating CMU Rejected B97
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Weights Farm, Weights Lane, Redditch, B97 6RG (4 components) Geocoding Needed

4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (5 components) Geocoding Needed

10MW battery energy storage facility at Upton Lane, Rownhams

Storage Battery Storage Storage (Duration 1h) GBSL NURSLING LIMITED New Build Generating CMU GBSL Nursling GBSL Nursling +1 more Conditional SO16
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
16.41 MW
Unit 3, Norcot Industrial Estate, Sterling Way, Reading, RG30 6HW (2 components) Geocoding Needed

Battery Energy Storage System

Inactive • 2020-21 (T-4), 2017-18 (T-1)
7.22 MW
Unit 3, Bloxwich Lane Estate, Walsall, WS2 8TF (1 component) Geocoding Needed

Battery Energy Storage System

Inactive • 2020-21 (T-4)
39.48 MW
Unit 3 Bloxwich Lane Estate Walsall WS2 8TF (1 component)

Battery Energy Storage System

Battery Storage NASU Energy Storage Limited New Build Generating CMU NASU Bloxwich WS2
Inactive • 2020-21 (T-4)
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components) Geocoding Needed
• 0.8 MW of demand reduction
• 0.8MW demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
16.16 MW
Slepe Farm Solar, Seven Acres Field, Slepe Farm, Slepe, Nr Poole, Dorset, BH16 6HS (2 components) Geocoding Needed

1 x 250kW/250kWh Lithium Ion Battery

Battery Storage LIMEJUMP LTD New Build Generating CMU Not Prequalified BH16
Inactive • 2020-21 (T-4), 2017-18 (T-1)
2.79 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA13 0PQ (3 components) Geocoding Needed

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
67.43 MW
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

Storage Battery Storage Storage (Duration 0.5h) CBS ENERGY STORAGE ASSETS UK LIMITED New Build Generating CMU Roosecote EFR Roosecote EFR +1 more LA13
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Poplars, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (4 components) Geocoding Needed
• 1 MW of demand reduction
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
10.98 MW
Pierces Farm, Field off Goring Lane, Grazeley Green, Reading, Berkshire. RG7 1LY (2 components) Geocoding Needed

1 x 250Kw/250KWh Lithium Ion Battery

Battery Storage LIMEJUMP LTD New Build Generating CMU Not Prequalified RG7
Inactive • 2020-21 (T-4), 2017-18 (T-1)
2.79 MW
Oxcroft Solar Farm, Stanfree, Chesterfield, Derbyshire, S44 6AG (2 components) Geocoding Needed

1 x 800kW/1100kWh BYD Lithium Ion Battery

Inactive • 2020-21 (T-4), 2017-18 (T-1)
2.79 MW
Oaks, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components) Geocoding Needed
• 1000kW/1200kWh Lithium Ion Battery
• 1MW demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
11.49 MW
Milton Court Farm, Dorking, RH4 3LY (5 components) Geocoding Needed
• 5MW battery energy storage facility at Milton Court Farm, Dorking
• 6MW battery energy storage facility at Milton Court Farm, Dorking
Storage Battery Storage Storage (Duration 1h) GBSL DORKING LIMITED New Build Generating CMU GBSL Dorking GBSL Dorking +1 more RH4
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
9.17 MW
Lucern, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (5 components) Geocoding Needed
• 1000kW/1200kWh Lithium Ion Battery
• 1MW demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
11.49 MW
Little Holt, Holt Lane, Hook RG27 9ER (4 components) Geocoding Needed
• 5MW battery energy storage facility at Little Holt, Holt Lane, Hook
• 6MW battery energy storage facility at Little Holt, Holt Lane, Hook
Storage Battery Storage GBSL HOOK LIMITED New Build Generating CMU GBSL Hook GBSL Hook Not Prequalified RG27
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
7.12 MW
Land south of Greengill Head Farm, off Maidenhill Road, Penrith, Cumbria CA11 8SH (1 component) Geocoding Needed

Electro-Chemical Battery Energy Storage System (BESS)

Battery Storage Energy Store 2 Ltd New Build Generating CMU STAGSTONE Energy Store 2 Ltd 8.0 Rejected CA11
Inactive • 2020-21 (T-4)
Land on South side of Charrington Farms, near Redhill, Surrey, RH2 8RB (1 component) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Battery Storage Low Carbon Storage Investment Company Limited New Build Generating CMU Charrington Storage Not Prequalified RH2
Inactive • 2020-21 (T-4)
6.74 MW
Land next to Dagnell End Rd, Alvechurch, Redditch B98 9BJ (4 components) Geocoding Needed

4 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery

Battery Storage LIMEJUMP LTD New Build Generating CMU Rejected B98
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components) Geocoding Needed

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Storage Battery Storage Storage (Duration 0.5h) GLASSENBURY BATTERY STORAGE LIMITED New Build Generating CMU Glassenbury Storage Glassenbury Storage +2 more TN17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
55.99 MW
Loading map...
Showing 25 locations