Open Cycle Gas Turbine (OCGT)
31 unique locations (312 components) - Page 1 of 2
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (6 components)
Weston Point CHP, INEOS Salt Works, Mersey View Road, Weston Point, Runcorn, WA7 4HB (10 components)
1 x OCGT (3)
Units 1-4, Hirwaun Industrial Estate, Hirwaun, Aberdare, S Wales, CF44 9UY (5 components)
Ty Coch Farm Greenfield Holywell CH87HT (8 components)
Gas fuelled generation plant (3)
The Yard, Holme Road, Stoney Holme, Burnley, BB12 0BJ (4 components)
3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure (3)
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)
Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones … (2)
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (4 components)
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (5 components)
New Hall Farm School Lane Birchwood Warrington WA3 6LH (3 components)
New Gas fulled generation station (3)
Millbrook Power Station, Rookery South Pit, Green Lane, Stewartby, Bedfordshire MK43 9LX (3 components)
Meaford Energy Centre, Meaford Business Park, Meaford Road, Meaford, Staffordshire, ST15 8UZ (4 components)
Gas Fired Generating Station (3)
Lynchford Lane, Farnborough, GU14 6LW (4 components)
10 gas reciprocating engines used for power generation, with associated infrastructure. (3)
Land off Well Street, Paisley, PA1 2QH (4 components)
4 gas reciprocating engines used for power generation, with associated infrastructure. (3)
Land adjacent to Brynfyrd Botley Road Romsey SO52 9DP (3 components)
Gas fuelled generation plant (2)
Kingsnorth. Hoo. St Werburgh. Rochester. Kent. ME3 9TX (8 components)
Kingsnorth, Hoo. St Werburgh, Rochester, Kent, ME3 9TX (2 components)
Combined Cycle Gas Turbine plant (2)
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (9 components)
Fiddler's Ferry Power Station, Widnes Road, Cuerdley, Warrington, WA5 2UT (73 components)
Ferrybridge Power Station, Stranglands Lane, Knottingley, West Yorkshire, WF11 8SQ (52 components)
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (5 components)
EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (5 components)
EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station. (3)
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (12 components)
Drax Power Station, Selby, YO8 8PH (1 component)
New Build Combined Cycle Gas Turbine plant to be installed on designated land at the Drax Power Station site
Drakelow Power Station, Burton on Trent, DE15 9TZ (5 components)
The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire. (3)
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (5 components)
One (1) Open Cycle Gas Turbine MSID: 7382 (3)