Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Solar Photovoltaic

31 unique locations (59 components) - Page 1 of 2

Active MW: 519.48 MW
Inactive MW: 1.66 MW
Winterton Landfill Site, Coleby Road, West Halton, Winterton, Lincolnshire, DN15 9TG (5 components)
• Solar PV generation site (2)
• SolarPV generating station
Solar Photovoltaic ALKANE ENERGY UK LIMITED INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Winterton Winterton Bletchley +3 more DN15
Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.58 MW
TOWNSEND FARM, POULSHOT, DEVIZES, SN10 1SD (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
Threemiletown Solar Farm Trinlaymire Farm Linlithgow West Lothian (1 component) Geocoding Needed

Solar photovoltaic generation scheme connected to the distribution network

Solar Photovoltaic ASE UK HOLDINGS LIMITED New Build Generating CMU Trinlaymire Solar Not Prequalified
Active • 2025-26 (T-4)
Sutton on Forest Solar, Plainville Lane, Wigginton, York, YO32 2RG (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
Sutton on Forest Solar Plainville Lane, Wigginton, York, YO32 2RG (1 component)
Solar Photovoltaic ASE UK HOLDINGS LIMITED New Build Generating CMU Sutton on Forest Solar Rejected YO32
Active • 2025-26 (T-4)
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
• Gas fired reciprocating engine(s) (2)
• Solar PV generation site
Solar Photovoltaic Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU SUTTONCOURTENAY Sutton Courtenay Solar Conditional OX14
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Stewartby Landfill Site, Green Lane, Stewartby, Bedfordshire, MK43 9LY (2 components)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Solar Photovoltaic Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU Stewartby Solar Conditional MK43
Active • 2025-26 (T-4), 2022-23 (T-4)
QUIDHAMPTON, POLEHAMPTON FARM, ASHE LANE, OVERTON, BASINGSTOKE, RG25 3BS (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Solar Photovoltaic ASE UK HOLDINGS LIMITED New Build Generating CMU Quidhampton Solar Rejected RG25
Active • 2025-26 (T-4)
Pwllheli, Lleyn, Welsh, LL53 6RH (1 component)

Solar Site

Solar Photovoltaic ENGIE POWER LIMITED Existing Generating CMU LL53
Active • 2025-26 (T-4)
Ongar Landfill Site, Mill Lane, Ongar, Essex, CM5 9RG (1 component)

Solar PV generation site

Solar Photovoltaic ALKANE ENERGY UK LIMITED New Build Generating CMU Ongar Solar Not Prequalified CM5
Active • 2025-26 (T-4)
Offham Landfill Site, Teston Road, Offham, West Malling, Kent, ME19 5PF (5 components)

Solar PV generation site

Solar Photovoltaic ALKANE ENERGY UK LIMITED ALKANE ENERGY CM LIMITED New Build Generating CMU Offham Solar Offham Solar +1 more ME19
Active • 2027-28 (T-4), 2026-27 (T-1) ...
1.90 MW
Newton Farm Newton South Queensferry West Lothian EH30 9SN (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Solar Photovoltaic ASE UK HOLDINGS LIMITED New Build Generating CMU Aithrie Net Zero Solar Not Prequalified EH30
Active • 2025-26 (T-4)
New Parks Estate, Huby, York, North Yorkshire, YO61 1JD (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Solar Photovoltaic ASE UK HOLDINGS LIMITED New Build Generating CMU Huby Solar Rejected YO61
Active • 2025-26 (T-4)
Manor Farm, Church Road, Maiden Newton, Dorchester, DT2 0AA (1 component)

Solar Voltaic generation scheme connected to the distribution network

Solar Photovoltaic ASE UK HOLDINGS LIMITED New Build Generating CMU Maiden Newton Solar Not Prequalified DT2
Active • 2025-26 (T-4)
Land to the West of Home Farm, Tingrith, Milton Keynes, Bedfordshire, MK17 9EW (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Solar Photovoltaic ASE UK HOLDINGS LIMITED New Build Generating CMU Sundon Solar Not Prequalified MK17
Active • 2025-26 (T-4)
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire (1 component) Geocoding Needed

Solar PV Park with maximum export capacity of 49.9MW

Solar Photovoltaic FP LUX SCURF DYKE SOLAR LIMITED New Build Generating CMU Scurf Dyke Solar Rejected
Active • 2025-26 (T-4)
LAND AT NEW FARM ESTATE, OUSE MOOR ROAD, YORK, YO26 6HU (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Solar Photovoltaic ASE UK HOLDINGS LIMITED New Build Generating CMU Poppleton Solar Rejected YO26
Active • 2025-26 (T-4)
Land at Fiddlers Green, Carland Cross Windfarm, St. Newlands East., Windfarm Postcode: TR8 5AY (2 components)

A Solar PV site consisting of 21,987 panels of 455W Solar PV Panels

Active • 2025-26 (T-4), 2022-23 (T-1)
Land adjacent Electricity Substation, Clay Hill Pit, Dormington, Hereford, Herefordshire, HR1 4EP (5 components)

New Build CMU comprising of Solar PV and associated plant

Solar Photovoltaic CONRAD (LARPORT) LIMITED New Build Generating CMU Larport Larport +1 more HR1
Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.32 MW
Colton Farm Lochead Dunfermline Fife KY10 (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Solar Photovoltaic ASE UK HOLDINGS LIMITED New Build Generating CMU Dunfermline Solar Rejected
Active • 2025-26 (T-4)
Coldham Estate Windfarm, Coldham, Cambridgeshire PE14 0LX (2 components)

A Solar PV site with a capacity of 9MW.

Active • 2025-26 (T-4), 2022-23 (T-1)
Loading map...
Showing 25 locations