Capacity Market Search

Showing components with technology: Storage (Duration 9h)

Displaying items 1 - 33 of 33 matching components

Foyers Power Station, Foyers, Inverness, IV2 6YB

Generating Unit 1

SSE Generation Limited CMU: FOYE-1 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 139.49 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Foyers Power Station, Foyers, Inverness, IV2 6YB

Generating Unit 2

SSE Generation Limited CMU: FOYE-2 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 139.49 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-3 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 279.31 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 282.63 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 279.16 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 280.21 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL

Grid Scale Battery Energy Storage.

DEESIDE POWER (UK) LIMITED CMU: D1_244 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 7.25 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Foyers Power Station, Foyers, Inverness, IV2 6YB

Generating Unit 1

SSE Generation Limited CMU: FOYE-1 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 141.56 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ.

Lithium-based battery energy storage system.

MELKSHAM CALNE GREEN LIMITED CMU: MELKSH Storage (Duration 9h) CMU De-Rated N/A CMU DB: 7.85 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Persley Croft, The Parkway, Aberdeen AB22 8AN

CMU ID 23PER4, a new build battery storage CMU located at Persley Croft, The Parkway, Aberdeen AB22 8AN

PERSLEY CROFT BESS LTD CMU: 23PER4 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 9.09 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land At Drum Farm Keith Moray AB55 5NP

Battery storage CMU

FIELD DRUM FARM LTD CMU: 23DRU4 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 9.06 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA

CMU ID 23KIN4, a new build battery storage CMU

WALPOLE GREEN LIMITED CMU: WALPOL Storage (Duration 9h) CMU De-Rated N/A CMU DB: 15.35 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

COWLEY BALDON GREEN LIMITED CMU: COWLEY Storage (Duration 9h) CMU De-Rated N/A CMU DB: 3.49 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter)

BESS project to be installed within a future Greener Grid Park.

BALWEN LIMITED CMU: THOR-4 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 31.13 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-3 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 283.77 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 283.30 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Pikevy Farm, Glenrothes, Fife, KY6 3HD

This is a 49.9MW battery storage facility connected at 33kV.

PITKEVEY BATTERY STORAGE LIMITED CMU: PITK27 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 7.90 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBB23 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 6.04 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBT23 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 7.91 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPKM23 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 3.49 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPLD23 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 6.50 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPNP23 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 7.91 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

ASHGREEN ENERGYFARM LIMITED CMU: PPNY23 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 7.25 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPSL23 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 5.68 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land bounded by The Rake, Lower Jowkin Lane and Furbarn Road, Rochdale. OL11 5UT

Rochdale (BES) Ltd is planning to install a battery storage system in an outdoor, fenced compound. Batteries will be installed in standard outdoor CATL modules with an internal racked system. …

ROCHDALE (BES) LTD CMU: 23ROC4 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 8.82 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF

Standalone battery storage system connecting at 33kV to the Broxburn substation

BROXBURN ENERGY STORAGE LIMITED CMU: BB_234 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 6.58 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY

Standalone battery storage system connecting at 33kV to the East Killbride substation

CATHKIN ENERGY STORAGE LIMITED CMU: CK_234 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 6.58 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP

New build BESS to be installed within a future Greener Grid Park.

LOGI ENERGY LIMITED CMU: FECB-1 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 11.32 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 284.27 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Foyers Power Station, Foyers, Inverness, IV2 6YB

Generating Unit 2

SSE Generation Limited CMU: FOYE-2 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 141.56 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) CMU De-Rated N/A CMU DB: 286.85 MW 2027-28 (T-4) Four Year Ahead Capacity Auction