Combined Heat and Power (CHP)

83 unique locations (301 components) - Page 1 of 4

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Withyhedge Landfill site, Rudbaxton, Haverfordwest SA62 4DB (1 component)

Engine generator sets

CHP and autogeneration Resources Management U.K. Limited New Build Generating CMU RML Engines set1 Rejected SA62
Inactive • 2021-22 (T-4)
Warehouse R, Royal Victoria Dock Northside, London, E16 1BA (4 components)

1.2MW Combined Heat and Power Engine (3)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Warehouse R Royal Victoria Dock Northside London E16 1BA (4 components)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Waddon Marsh, Purley Way, Croydon, CR0 4NX (2 components)

A reciprocating gas engine CHP providing hot water to a local heat network (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Waddon Marsh Purley Way Croydon CR0 4NX (2 components)
CHP and autogeneration E.ON UK PLC Existing Generating CMU CEN003 Rejected CR0
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB (1 component)

Generating Plant located at Stoneywood Mill, Bucksbum, Aberdeen, AB21 9AB

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU AW Stoneywood AB21
Inactive • 2021-22 (T-4)
Station Road, Chartham, Kent, CT4 7JA (1 component)

Generating Plant located at Station Road, Chartham, Kent, CT4 7JA

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU AW Chartham CT4
Inactive • 2021-22 (T-4)
Southport & Formby District General hospital, Town Lane Kew, Southport PR8 6PN (2 components)

Gas reciprocating engine. (2)

CHP and autogeneration VEOLIA UK LIMITED Existing Generating CMU Southport & Ormskirk Hospitals Rejected PR8
Inactive • 2021-22 (T-4), 2018-19 (T-1)
SO45 1TX (3 components)
• TG1B is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which TG1B of medium size. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - Unit 3).
• Unit 3 is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - TG1B).
• Unit 5 is part of the aggregated CMU EM3-21, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (MSID 7081). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW.
CHP and autogeneration ESSO PETROLEUM COMPANY,LIMITED Existing Generating CMU EPCo Fawley CMU SO45
Inactive • 2021-22 (T-4)
Smurfit Kappa Townsend Hook, Snodland, Kent, ME6 5AX (2 components)

10.754 MW CHP Plant with 2 new Gas Turbines (2)

CHP and autogeneration LIMEJUMP LTD Townsend Hook Not Prequalified ME6
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (2 components)
CHP and autogeneration LIMEJUMP LTD New Build Generating CMU Townsend Hook Not Prequalified ME6
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Showground Road, Bridgwater, TA6 6AJ (1 component)

An energy from waste development situated on Showground Road, Bridgwater with an export capacity of 7.75 MWe

CHP and autogeneration Bridgwater Resource Recovery Limited New Build Generating CMU Not Prequalified TA6
Inactive • 2021-22 (T-4)
Shelton Road, Willowbrook Industrial Estate, Corby, Northamptonshire, NN17 5XH (1 component)

The CMU will be an energy from waste generator and will consist of a steam turbine

CHP and autogeneration E.ON CONNECTING ENERGIES LIMITED New Build Generating CMU Corby EfW CHP NN17
Inactive • 2021-22 (T-4)
Seal Sands, Middlesbrough, TS2 1UB (12 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesborough, TS2 1UB (12 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (3 components)
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant and buildings.
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated ancillary plant and buildings.
CHP and autogeneration Combined Heat and Power (CHP) Palm Paper Limited Existing Generating CMU Palm Paper CHP Palm Paper CHP PE34
Active • 2029-30 (T-4), 2028-29 (T-4) ...
84.93 MW
Red Roofs Nursery Limited, North Moor Lane, Cottingham, HU16 4JN (2 components)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Red Roofs Nursery Limited North Moor Lane Cottingham HU16 4JN (2 components)
CHP and autogeneration E.ON UK PLC Existing Generating CMU EON1825 HU16
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Red Roofs Nursery Limited, Dunswell Road, Cottingham, Hull, East Yorkshire, HU16 4JT (2 components)

CHP engine supplying heat and power to agricultural greenhouses

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Racecourse Road, Newbury, West Berkshire, RG14 7NZ (2 components)

A reciprocating gas engine CHP providing hot water to a local heating network

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Racecourse Road Newbury West Berkshire RG14 7NZ (2 components)
CHP and autogeneration E.ON UK PLC Existing Generating CMU CEN003 Rejected RG14
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Queensland Road, Islington, London, N7 7AJ (2 components)

A reciprocating gas engine CHP providing hot water to a local CHP network

CHP and autogeneration E.ON UK PLC Existing Generating CMU CEN003 Rejected N7
Inactive • 2021-22 (T-4), 2018-19 (T-1)