Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

513 unique locations (3442 components) - Page 1 of 21

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Young's House, Wickham Road, Grimsby DN32 8HW (4 components) Geocoding Needed
• On-site Generating CMU
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
Woodhouse Energy Centre, A. Pearson and Sons? Nursery, Alderley Edge, SK9 7UW (9 components) Geocoding Needed
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.05 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (18 components) Geocoding Needed
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +5 more WA16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.64 MW
Withyhedge Lanfill, Rudbaxton, Haverfordwest,Pembrokshire Sa62 4DB (1 component)

Engine set

CHP and autogeneration Resources Management U.K. Limited New Build Generating CMU RML Engines set1 Rejected SA62
Inactive • 2021-22 (T-4)
Withyhedge Landfill site, Rudbaxton, Haverfordwest SA62 4DB (1 component) Geocoding Needed

Engine generator sets

CHP and autogeneration Resources Management U.K. Limited New Build Generating CMU RML Engines set1 Rejected SA62
Inactive • 2021-22 (T-4)
2.68 MW
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (3 components)

The CMU is a gas fired CCGT CHP (3)

CHP and autogeneration Combined Heat and Power (CHP) BRITISH SUGAR PLC Existing Generating CMU Wissington CHP Wissington CHP +1 more PE33
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire, CW8 4GX (28 components) Geocoding Needed
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
462.46 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire (1 component) Geocoding Needed

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active • 2027-28 (T-4)
14.23 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire (1 component) Geocoding Needed

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active • 2027-28 (T-4)
14.23 MW
Wight Salads, Arreton, Newport, Isle of Wight, PO30 3AR (5 components) Geocoding Needed

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.01 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (2 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used (2)

Inactive • 2023-24 (T-1), 2022-23 (T-1)
5.48 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (2 components) Geocoding Needed

New-Build CHP Generating Unit at Berry Wicks Farm.

Active • 2028-29 (T-4), 2025-26 (T-4)
1.26 MW
Whitfire Shavings and Sawdust Supplies Ltd, Heatherfield Works, Church Lane, Farington, Nr Preston, PR26 6RD (2 components) Geocoding Needed

CHP Unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN15 PR26
Active • 2025-26 (T-4), 2023-24 (T-4)
1.18 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components) Geocoding Needed
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +2 more WR11
Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.62 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components) Geocoding Needed

2026 kW CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.10 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
39.32 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (6 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated 3 CE_Aggregated 3 +1 more HA9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.96 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components) Geocoding Needed

Warrington Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.64 MW
Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (1 component) Geocoding Needed

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
2.70 MW
Warrington Hospital, Lovely Lane, Warrington, Cheshire WA5 1QG (1 component) Geocoding Needed

1 x Natural Gas Fired CHP unit

Inactive • 2019-20 (T-1)
2.70 MW
Warrington Hospital, Lovely Lane, Warrington, CheshireWA5 1QG (1 component) Geocoding Needed

1 x Natural Gas Fired CHP unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU Rejected
Inactive • 2019-20 (T-1)
Warehouse R, Royal Victoria Dock Northside, London, E16 1BA (4 components) Geocoding Needed

1.2MW Combined Heat and Power Engine

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
9.62 MW
Warehouse R Royal Victoria Dock Northside London E16 1BA (2 components)

1.2MW Combined Heat and Power Engine (2)

Inactive • 2018-19 (T-1), 2017-18 (T-1)
Loading map...
Showing 25 locations