Young's House, Wickham Road, Grimsby DN32 8HW (4 components) Geocoding Needed
β€’ On-site Generating CMU
β€’ on site generating CMU
Active β€’ 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
Woodhouse Energy Centre, A. Pearson and Sons? Nursery, Alderley Edge, SK9 7UW (9 components) Geocoding Needed
β€’ The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
β€’ The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
β€’ The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
20.05 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (18 components) Geocoding Needed
β€’ 2MW gas CHP engine in a horticultural environment
β€’ One 1.5 MW gas CHP engine in a horticultural environment
β€’ One 2MW gas CHP engine in a horticultural environment
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +5 more WA16
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
25.64 MW
374.81 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire, CW8 4GX (28 components) Geocoding Needed
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
β€’ Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
β€’ Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
462.46 MW
Winnington CHP, Winnington Lane, Winnington, Northwich, Cheshire (1 component) Geocoding Needed

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active β€’ 2027-28 (T-4)
14.23 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire (1 component) Geocoding Needed

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active β€’ 2027-28 (T-4)
14.23 MW
Wight Salads, Arreton, Newport, Isle of Wight, PO30 3AR (5 components) Geocoding Needed

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Active β€’ 2024-25 (T-4), 2023-24 (T-4) ...
19.01 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (2 components) Geocoding Needed

New-Build CHP Generating Unit at Berry Wicks Farm.

Active β€’ 2028-29 (T-4), 2025-26 (T-4)
1.26 MW
Whitfire Shavings and Sawdust Supplies Ltd, Heatherfield Works, Church Lane, Farington, Nr Preston, PR26 6RD (2 components) Geocoding Needed

CHP Unit

Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU ZGEN15 PR26
Active β€’ 2025-26 (T-4), 2023-24 (T-4)
1.18 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components) Geocoding Needed
β€’ Gas CHP in a horticultiral environment providing heat for crop growth
β€’ One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
CHP and autogeneration Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX110 FLEX110 +2 more WR11
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
16.62 MW
Westexe, Tiverton, Devon, EX16 5LL (6 components) Geocoding Needed

2026 kW CHP unit

Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
9.10 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
39.32 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (6 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated 3 CE_Aggregated 3 +1 more HA9
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
5.96 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components) Geocoding Needed

Warrington Existing Site CHP

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
13.64 MW
Valley Park Industrial Estate, Meadow Gate, Wombwell, Barnsley, S73 0UN (1 component) Geocoding Needed

Generating unit

Active β€’ 2025-26 (T-4)
University of Warwick, Coventry, CV4 7AL (48 components) Geocoding Needed
β€’ One of six CHP units at University of Warwick, Coventry, CV4 7AL
β€’ One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU GC2426 GCMU18 +4 more CV4
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
38.88 MW
University of East Anglia, Norwich Research Park, Norwich, NR4 7TJ (7 components) Geocoding Needed

CHP

Active β€’ 2024-25 (T-1), 2023-24 (T-1) ...
15.17 MW
University of East Anglia, Norwich Research Park, Norwich NR4 7TJ (1 component) Geocoding Needed

Behind the Meter CHP Unit

Active β€’ 2025-26 (T-1)
3.62 MW
7.20 MW
7.25 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (9 components) Geocoding Needed
β€’ Gas CHP in St. Austell
β€’ Gas fired CHP unit
Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG55 PL26
Active β€’ 2026-27 (T-4), 2025-26 (T-4) ...
13.60 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (10 components) Geocoding Needed
β€’ Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
β€’ Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
13.42 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (10 components)

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations (3)

Active β€’ 2028-29 (T-4), 2026-27 (T-4) ...
5.59 MW
Loading map...
Showing 25 locations