Combined Heat and Power (CHP)

314 unique locations (2726 components) - Page 12 of 13

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Barrow Man Road Birchington Kent CT7 0AX (9 components)

Two CHP engines in horticultural environment with no auxilliary load (3)

Active • 2028-29 (T-4), 2025-26 (T-4) ...
4.73 MW
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (9 components) Geocoding Needed

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more E16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.48 MW
Barrack Road, Exeter, EX2 5DW. (5 components) Geocoding Needed

1.521 MW CHP unit

Active • 2026-27 (T-4), 2024-25 (T-4) ...
6.52 MW
Barnsley Facilities Services Limited, Estates & Facilities Department, Gawber Road, Barnsley, S75 2EP (12 components) Geocoding Needed
• 1 MW CHP generation
• 1.000 MW CHP generation
• 1.1MW Diesel CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.84 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (4 components) Geocoding Needed

on site generating CMU

Active • 2027-28 (T-4), 2025-26 (T-4) ...
5.85 MW
Aventine Way, Glebe Farm Industrial Estate, Rugby, CV21 1HA (14 components) Geocoding Needed

A gas CHP supplying a manufacturing facility

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU BVC_CHP BVC_CHP +2 more CV21
Active • 2027-28 (T-4), 2025-26 (T-4) ...
11.94 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (28 components) Geocoding Needed
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19.70 MW
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (10 components)
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW (2)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
Active • 2025-26 (T-1), 2024-25 (T-1) ...
5.26 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (6 components) Geocoding Needed

Existing Generation on existing site - CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.67 MW
Ashgrove Road West, Aberdeen AB16 5UL (13 components) Geocoding Needed
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas.
• District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.14 MW
APS Growers Ltd / Branfield Nursery, 111 Stockbridge Road, Elloughton, HU15 1HW (13 components) Geocoding Needed
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
17.59 MW
Alderley Park Limited, Alderley Park, Congleton Road, Nether Alderley, Macclesfield, SK10 4TF. (1 component) Geocoding Needed

1 X gas engine with a gross capacity of 5.400 MW at MCR and ISO conditions

Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Alderley Park Limited SK10
Active • 2025-26 (T-1)
3.23 MW
Adlington Works, Market Street, Adlington, Lancashire, PR7 4HJ (3 components) Geocoding Needed

CHP with 1.280 rated capacity

Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.66 MW
Address: Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (10 components) Geocoding Needed

Gas fired CHP

Active • 2025-26 (T-4), 2024-25 (T-4) ...
112.83 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (9 components) Geocoding Needed
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more RM8
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.43 MW
9 Handyside St, Kings Cross, London N1C 4BH (11 components) Geocoding Needed

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2025-26 (T-4) ...
10.44 MW
96 Kings Rd, Immingham DN40 1QS (2 components) Geocoding Needed
• Existing Generating CHP
• New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU GB2502 DN40
Active • 2028-29 (T-4), 2025-26 (T-4)
3.23 MW
84 Castle St, Glasgow G4 0SF (1 component) Geocoding Needed

Behind the Meter CHP

Active • 2025-26 (T-1)
1.82 MW
66 Molesworth Street, London SE13 7EY (9 components) Geocoding Needed
• Behind the Meter CHP Unit
• CHP plant
• Gas fired CHP unit
Active • 2025-26 (T-1), 2024-25 (T-1) ...
17.68 MW
5 Coulman St, Thorne, Doncaster DN8 5JT (2 components) Geocoding Needed
• On-Site Generating CMU
• new build on site generating CMU
Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU On-Site Energy - Chesterfield Poultry DN8
Active • 2027-28 (T-4), 2025-26 (T-4)
1.37 MW
530 London Road, Croydon, CR7 7YE (4 components) Geocoding Needed

Gas fired CHP unit

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU KPEG69 CR7
Active • 2024-25 (T-1), 2023-24 (T-1) ...
4.68 MW
530 London Rd, Thornton Heath CR7 7YE (1 component) Geocoding Needed

Behind the Meter CHP Unit

Active • 2025-26 (T-1)
1.41 MW
4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA (2 components) Geocoding Needed

New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA

Combined Heat and Power (CHP) FLEXITRICITY LIMITED New Build Generating CMU FLEX142 G32
Active • 2025-26 (T-4), 2022-23 (T-1)
1.86 MW
47-53 Charterhouse Street, London, EC1M 6PB (15 components) Geocoding Needed
• A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
• A site with two reciprocating gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
CHP and autogeneration Combined Heat and Power (CHP) CITIGEN (LONDON) LIMITED Existing Generating CMU Citigen Citigen +7 more EC1M
Active • 2028-29 (T-4), 2027-28 (T-4) ...
65.59 MW
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components) Geocoding Needed
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Active • 2027-28 (T-4), 2025-26 (T-4) ...
19.89 MW
Loading map...