Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

508 unique locations (3420 components) - Page 15 of 21

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Esso Petroleum Company, Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (8 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-21 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 137.533 MW At these three HH times, aux load on Unit 5 = 2.513 MW Net generation from Unit 5 = 135.020 MW
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1001.05 MW
Engie, Great Coates, Grimsby, DN31 2TT (35 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
24.24 MW
Engie Great Coates, Grimsby, DN31 2TT (10 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks (2)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Combined Heat and Power (CHP) BRING ENERGY LIMITED Existing Generating CMU Humber Humber +2 more DN31
Active • 2024-25 (T-1), 2023-24 (T-1) ...
4.09 MW
Engie Great Coates, Grimsby, DN31 2TT (15 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the … (3)

Combined Heat and Power (CHP) BRING ENERGY LIMITED Existing Generating CMU Humber Humber +2 more DN31
Active • 2024-25 (T-1), 2023-24 (T-1) ...
6.14 MW
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (4 components)
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
Combined Heat and Power (CHP) VITAL ENERGI SOLUTIONS LIMITED New Build Generating CMU COV COV +1 more CV2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.03 MW
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (20 components)

A gas engine CHP site providing electricity & heat to the associated development

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE WST_CRB2 CE WST_CRB2 +6 more W12
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.79 MW
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (5 components)

4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.94 MW
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (8 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
10.71 MW
Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ (1 component)

VIT42A - CHP unit at Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ

Active • 2025-26 (T-4)
2.41 MW
Energy Centre, Lower Mosley Street, Manchester M2 3GX (4 components)

A 3.36MW gas fired reciprocating engine CHP.

Combined Heat and Power (CHP) VITAL ENERGI SOLUTIONS LIMITED New Build Generating CMU CQH CQH +1 more M2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.00 MW
Energy Centre, Ashton Street, Liverpool, L69 3GB (2 components)

One of the three CHP units at Energy Centre, Ashton Street, Liverpool, L69 3GB

Active • 2025-26 (T-4), 2025-26 (T-1)
2.24 MW
Energy Centre, Ashton Street, L69 3GB (4 components)

One of three CHP units at Energy Centre, Ashton Street, L69 3GB

Active • 2025-26 (T-4), 2025-26 (T-1)
4.49 MW
ENERGY CENTRE, 13 HOOKERS ROAD, WALTHAMSTOW, LONDON, E17 6DPTQ 358 896 , (6 components)

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC CE_Aggregated 3 CE_Aggregated 3 E17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.02 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (36 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
45.86 MW
Ellifoot Lane, Burstwick, HU12 9EB (5 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.57 MW
Elephant Park Energy Centre, Rodney Road, London, SE17 1FJ (14 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU HEY_CHP HEY_CHP +4 more SE17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.37 MW
Edgabaston, Birmingham, West Midlands, B15 2TT (18 components)
• Gas Engine
• Gas engine
• Gas turbine generator
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST01 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more B15
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
76.59 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (33 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• TLOR-1 1 ea 38MWe Cogeneration Unit 9G1
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST07 EA 17/18 REST08 +14 more DN40
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
305.66 MW
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (4 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX108 EH25
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.51 MW
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX168 HU16
Active • 2028-29 (T-4), 2025-26 (T-1)
1.91 MW
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (14 components)
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Combined Heat and Power (CHP) KEMSLEY CHP LIMITED New Build Generating CMU DSK_1YR DSK_CHP +4 more ME10
Active • 2025-26 (T-4), 2024-25 (T-4) ...
366.04 MW
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (9 components)

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more UB7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.51 MW
Drakemyre, Dalry KA24 5JJ (17 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
108.65 MW
Downs Rd, Sutton SM2 5PT (3 components)
• Behind the Meter CHP
• Emergency Behind the Meter Diesel Generator
Active • 2025-26 (T-4), 2025-26 (T-1)
1.87 MW
Donaldsons Nursery, Vinnetrow Road, Runcton, Chichester PO20 1QD (1 component)

Existing Generating CHP

Active • 2025-26 (T-1)
1.39 MW
Loading map...
Showing 25 locations