Combined Heat and Power (CHP)

513 unique locations (3442 components) - Page 17 of 21

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
COFELY, Great Coates, Grimsby, DN31 2TT (45 components) Geocoding Needed
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
10.76 MW
COFELY Great Coates, Grimsby, DN31 2TT (15 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks (2)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cobden Street, Montrose, Angus, DD10 8EA (9 components) Geocoding Needed

On-site existing CHP generating unit

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1B-MT Glaxo Barnard Montrose Ware & Worthing +2 more DD10
Active • 2024-25 (T-4), 2023-24 (T-4) ...
17.16 MW
Clyst St. Mary, Exeter, EX5 1SD (3 components) Geocoding Needed
• energy from waste unit
• generating gas unit
Active • 2027-28 (T-4)
9.88 MW
Clough Green, Cawthorne, Barnsley, S75 4AD (3 components) Geocoding Needed

On-site Generating CMU.

Active • 2025-26 (T-4), 2024-25 (T-1)
2.69 MW
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (6 components) Geocoding Needed
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST03 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
60.33 MW
Cleckheaton Road, Low Moor Bradford BD12 0JZ (4 components) Geocoding Needed
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe)
• Gas Turbine Generator 6.4MW CHP (tornado SGT 200 rated 6,4 MWe) BABR-1_1
CHP and autogeneration Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +1 more BD12
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
59.73 MW
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (6 components) Geocoding Needed
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
66.03 MW
Cleckheatone Road, Lowmoore, Bradford, BD12 0JZ (1 component) Geocoding Needed

Gas Turbine CHP (typhoon) SGT-100 rated 4.9MWe BABR-1_2

Inactive • 2019-20 (T-1)
4.41 MW
Clay Wheels Ln, Wadsley Bridge S6 1LY (2 components) Geocoding Needed
• On-Site Generating CMU
• new build on site generating CMU
Active • 2027-28 (T-4), 2025-26 (T-1)
2.31 MW
Clatterbridge Road, Bebington, Birkenhead, Wirral CH63 4JY (3 components) Geocoding Needed

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
4.49 MW
Church Manorway, Erith DA8 1DL (36 components) Geocoding Needed

gas-fired CHP unit

CHP and autogeneration Combined Heat and Power (CHP) ENEL X UK LIMITED Existing Generating CMU EGEN22 EGEN22 +5 more DA8
Active • 2025-26 (T-4), 2024-25 (T-1) ...
59.86 MW
Chryston, Moodiesburn, Glasgow G69 0JE (3 components) Geocoding Needed

On-site Generating CMU.

Active • 2028-29 (T-4), 2025-26 (T-1) ...
4.92 MW
Charter Way, Macclesfield SK10 2NA, United Kingdom (1 component) Geocoding Needed

CHP Unit

Inactive • 2023-24 (T-1)
10.65 MW
Chareteris Place Edinburgh EH8 8FN (2 components) Geocoding Needed

CHP generating for site load, which exceeds generating capacity. No aux load.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU Rejected EH8
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (3 components) Geocoding Needed

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
5.41 MW
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (2 components)

Turbo Expander - for pressure reduction of incoming natural gas (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (3 components) Geocoding Needed

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-1) ...
4.07 MW
Carr Lane, Leyland, Lancashire, PR25 3UD (2 components) Geocoding Needed
• 10 gas engines in an energy centre environment, exporting electricity
• 3 gas engines in an energy centre environment, exporting electricity
Inactive • 2021-22 (T-4)
5.40 MW
Carr Lane, Leyland , Lancashire, PR25 3UD (2 components)
• 10 gas engines in an energy centre environment, exporting electricity
• 3 gas engines in an energy centre environment, exporting electricity
CHP and autogeneration FLEXITRICITY LIMITED New Build Generating CMU FLEX55 FLEX56 Rejected PR25
Inactive • 2021-22 (T-4)
Carlton Forest, Blyth Road, Worksop, S81 0TP (2 components) Geocoding Needed
• A New Build 10MW Fuelled Generating Station.
• A New Build 8MW ACT generating station using a closed loop steam system.
Inactive • 2021-22 (T-4)
16.68 MW
Cargill Port of Liverpool CHP, Regent Road, Bootle, Liverpool, L20 1ED (1 component) Geocoding Needed

RB211 Gas Turbine based CHP

Combined Heat and Power (CHP) CARGILL PLC Existing Generating CMU Rejected L20
Active • 2028-29 (T-4)
27.40 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (45 components) Geocoding Needed
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
CHP and autogeneration Combined Heat and Power (CHP) CARGILL PLC Existing Generating CMU Cargill Manch Generation Cargill Manch Generation +8 more M17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
273.39 MW
Cargill PLC, Trafford Park, M17 1PA (15 components) Geocoding Needed

Siemens SGT200 Based CHP

Reciprocating Engines CHP and autogeneration Combined Heat and Power (CHP) CARGILL PLC Existing Generating CMU Cargill Manch Generation Cargill Manch Generation +8 more M17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
231.35 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (22 components) Geocoding Needed
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
102.71 MW
Loading map...
Showing 25 locations