Speke Operations, Fleming Rd, Liverpool L24 9LN (5 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807 (2)
• Speke combined heat and power plant.
CHP and autogeneration Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU SPEKE CHP SPEKE CHP L24
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Southport & Formby District General hospital, Town Lane Kew, Southport PR8 6PN (2 components)

Gas reciprocating engine. (2)

CHP and autogeneration VEOLIA UK LIMITED Existing Generating CMU Southport & Ormskirk Hospitals Rejected PR8
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Southport and Formby District General Hospital Town Lane, Kew Southport Merseyside PR8 6PN (1 component)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.008 MW

Inactive • 2022-23 (T-4)
Southport and Formby District General Hospital Town Lane, Kew Southport Merseyside PR8 6PN (1 component)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.008 MW

Inactive • 2019-20 (T-1)
South Kensington Campus, London, SW7 2AZ (4 components)
• One of two, 4.5MW CHP engines at Imperial Collage London (2)
• One of two, 4.5MW CHP engines located at Imperial College London
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Southampton General Hospital, Tremona Road, Southampton, SO16 6YD (2 components)

2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW. (2)

Combined Heat and Power (CHP) VEOLIA UK LIMITED Existing Generating CMU Southampton General Hospital SO16
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Solenis UK Industries Limited, Cleckheaton Road, Low Moor, Bradford, West Yorkshire, BD12 0JZ (6 components)
• CHP Tornado SGT-200 6.4MWh (2)
• CHP Typhoon SGT-100 4.7MWh
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
SO45 1TX (3 components)
• TG1B is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which TG1B of medium size. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - Unit 3).
• Unit 3 is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - TG1B).
• Unit 5 is part of the aggregated CMU EM3-21, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (MSID 7081). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW.
CHP and autogeneration ESSO PETROLEUM COMPANY,LIMITED Existing Generating CMU EPCo Fawley CMU SO45
Inactive • 2021-22 (T-4)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (1 component)

10.754 MW CHP Plant with 2 new Gas Turbines

CHP and autogeneration LIMEJUMP LTD New Build Generating CMU Townsend Hook Not Prequalified ME6
Inactive • 2021-22 (T-4)
Smurfit Kappa Townsend Hook, Mill Street, Snodland, Kent, ME6 5AX (5 components)
• 5.2MWe CHP gas turbine (2)
• GT2 CHP unit rated at 5.2MW
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Showground Road, Bridgwater, TA6 6AJ (1 component)

An energy from waste development situated on Showground Road, Bridgwater with an export capacity of 7.75 MWe

CHP and autogeneration Bridgwater Resource Recovery Limited New Build Generating CMU Not Prequalified TA6
Inactive • 2021-22 (T-4)
Shewalton Road, Irvine, West Sussex, KA11 5AP (4 components)

CHP and autogeneration (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Shelton Road, Willowbrook Industrial Estate, Corby, Northamptonshire, NN17 5XH (1 component)

The CMU will be an energy from waste generator and will consist of a steam turbine

CHP and autogeneration E.ON CONNECTING ENERGIES LIMITED New Build Generating CMU Corby EfW CHP NN17
Inactive • 2021-22 (T-4)
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (2 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Combined Heat and Power (CHP) Sembcorp Utilities (UK) Limited Existing Generating CMU Sembcorp Wilton GT2 Sembcorp Wilton GT2 TS90
Inactive • 2019-20 (T-1), 2017-18 (T-1)
Seal Sands, Middlesborough, TS2 1UB (12 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (4 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network. (3)

CHP and autogeneration Combined Heat and Power (CHP) Energy Pool UK limited Existing Generating CMU EPO014 EPO014 Rejected NN17
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Salisbury District Hospital, Odstock Road, Salisbury, Wiltshire. SP2 8BJ. (1 component)

1 x 850kW natural gas genset feeding site

CHP and autogeneration LIMEJUMP LTD Existing Generating CMU Avocardos SP2
Inactive • 2018-19 (T-1)
Runnings Road, Cheltenham, Gloucestershire, GL51 9NQ (2 components)

A gas engine CHP site providing steam and electricity to an industrial unit (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (3 components)

Energy from Waste Recovery Facility (3)

Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Royal Preston Hospital, Sharoe Green Lane, Fulwood, Preston PR2 9HT (1 component)

CHP plant

Combined Heat and Power (CHP) KIWI POWER LTD Existing Generating CMU Rejected PR2
Inactive • 2019-20 (T-1)
Royal Berkshire NHS Foundation Trust, London Road, Reading, RG1 5AN (2 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.992 MW (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Rocks Dryer, Rosevear Road, Bugle - St.Austell PL268PJ (3 components)

One 3.7 MWe gas fired CHP (Centrax KB5) (3)

CHP and autogeneration Combined Heat and Power (CHP) Imerys Minerals Limited Existing Generating CMU Rocks Dryer CHP Rocks Dryer CHP PL26
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Red Roofs Nursery Limited, North Moor Lane, Cottingham, Hull, HU16 4JN (3 components)

A gas engine CHP site providing hot water to agricultural greenhouses (2)

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU OSG_RR01 RR_MICH CHP HU16
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...