Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

537 unique locations (4662 components) - Page 5 of 22

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
SO45 1TX (3 components)
• TG1B is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which TG1B of medium size. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - Unit 3).
• Unit 3 is part of the aggregated CMU EM3-21, which is made up of 3 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the E_FAWND BMU and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU - TG1B).
• Unit 5 is part of the aggregated CMU EM3-21, which made up of 3 Generating Units of which Unit 5 is the largest. This Generating Unit forms the E_FAWN-1 BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCo1. All Components of EM3-21 are located within the physical boundaries of the Esso Petroleum Company Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (MSID 7081). All three units share various auxiliary load equipment - the power for which is supplied from another part of the LDN Fawley North Sub-Station. The auxiliary power will have half hourly meters, these will be installed in time to pass a Metering Test for this Capacity Market. For now, using the same method as for the T4 -2018 Capacity Market, we have determined this to be ~ 7.72s MW (maximum consumption over the three Highest Generation points) which represents 9.79% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 9.79/3 = 3.26% of MSID 7096, thus 2.574 MW.
CHP and autogeneration ESSO PETROLEUM COMPANY,LIMITED Existing Generating CMU EPCo Fawley CMU SO45
Inactive • 2021-22 (T-4)
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (5 components)

On-site Generating CMU. (3)

Active • 2029-30 (T-4), 2028-29 (T-4) ...
47.28 MW
Smurfit Kappa Townsend Hook, Snodland, Kent, ME6 5AX (2 components)

10.754 MW CHP Plant with 2 new Gas Turbines (2)

CHP and autogeneration LIMEJUMP LTD Townsend Hook Not Prequalified ME6
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa Townsend Hook Snodland Kent ME6 5AX (2 components)
CHP and autogeneration LIMEJUMP LTD New Build Generating CMU Townsend Hook Not Prequalified ME6
Inactive • 2021-22 (T-4), 2018-19 (T-1)
Smurfit Kappa Townsend Hook, Mill Street, Snodland, Kent, ME6 5AX (5 components)
• 5.2MWe CHP gas turbine (2)
• GT2 CHP unit rated at 5.2MW
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham, B7 5RE (13 components)

1 x 3.5MW natural gas fired turbine + 1 x 4.8MW natural gas fired turbine (2)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)

8.300MW Gas Turbine installation (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
7.58 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (3 components)

One 2MW gas CHP engine in a horticultural environment (3)

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX159 SL2
Active • 2027-28 (T-4), 2024-25 (T-1) ...
5.31 MW
Showground Road, Bridgwater, TA6 6AJ (1 component)

An energy from waste development situated on Showground Road, Bridgwater with an export capacity of 7.75 MWe

CHP and autogeneration Bridgwater Resource Recovery Limited New Build Generating CMU Not Prequalified TA6
Inactive • 2021-22 (T-4)
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (8 components)

Gas fuelled CHP generation plant (3)

Active • 2027-28 (T-4), 2025-26 (T-4) ...
16.48 MW
Shewalton Road, Irvine, West Sussex, KA11 5AP (4 components)

CHP and autogeneration (2)

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Shelton Road, Willowbrook Industrial Estate, Corby, Northamptonshire, NN17 5XH (1 component)

The CMU will be an energy from waste generator and will consist of a steam turbine

CHP and autogeneration E.ON CONNECTING ENERGIES LIMITED New Build Generating CMU Corby EfW CHP NN17
Inactive • 2021-22 (T-4)
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS, United Kingdom (12 components)

CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
153.09 MW
"Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom" (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
153.09 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (22 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2029-30 (T-4), 2028-29 (T-4) ...
246.10 MW
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (22 components)
CHP and autogeneration Combined Heat and Power (CHP) Sembcorp Utilities (UK) Limited Existing Generating CMU Sembcorp Wilton GT1 Sembcorp Wilton ST11 TS90
Active • 2029-30 (T-4), 2028-29 (T-4) ...
246.10 MW
Seal Sands, Middlesbrough, TS2 1UB (12 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesborough, TS2 1UB (12 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
School Road, Aberdeen AB24 1TU (14 components)
• District heating implementation with 2 x 1.063MW CHP exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. Historic Average Output is 1,916.424kW.
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.96 MW
Sapphire Mill, Glenwood Rd, Leslie, Glenrothes KY6 3AB (3 components)

Existing Generating CMU/

Active • 2029-30 (T-4), 2026-27 (T-1) ...
3.71 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (12 components)
• Gas CHP in horticultural environment providing heat & electricity for crop growth
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2029-30 (T-4), 2027-28 (T-4) ...
4.12 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (12 components)

Callington - Existing Site CHP unit

Active • 2029-30 (T-4), 2028-29 (T-4) ...
16.67 MW
Loading map...
Showing 25 locations