Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (24 components)
• TG1B is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND' BMU and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD244' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
• Unit 3 is part of the aggregated CMU EMD-19, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD-19? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 7.954/3 = 2.6513% of MSID 7096, thus 2.024 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU i.e. TG1B). Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested. Gross 3 HH av. peak generation from Unit 3 on separate days = 32.869 MW At these three HH times, aux load on Unit 3 = -1.468 MW Net generation from Unit 3 = 31.401 MW
• Unit 3 is part of the aggregated CMU EMD244, which is made up of 2 Generating Units of which Unit 3 is the smallest. This Generating Unit is embedded in the ?E_FAWND? BMU and is part of the larger site inclusive BM Trading Unit, ?EPCO1?. All Components of ?EMD244? are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 3 is one of three power generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at their Fawley North Sub-Station (part of MSID 7095). Both units share various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. Installation of separate metering for the auxiliary power for both TG1B and Unit 3 has been completed providing half hourly meters for the auxiliary load for the two units. Due to the large amount of common equipment shared by the two generation units (TG1B and Unit 3) we are unable to determine exactly what part of the auxiliary load is directly attributable to Unit 3 and thus for this CMU we have attributed the auxiliary load between the two. The auxiliary meters for Unit 3 and TG1B combined are: TR1MWI_MAIN, TR2MWI_MAIN and 26AMWI_MAIN. This entire metering configuration has been successfully assessed and tested.
Combined Heat and Power (CHP) ESSO PETROLEUM COMPANY,LIMITED Existing Generating CMU EMD-18 EMD-18 +3 more SO45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
630.41 MW
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (8 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW (2)
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Combined Heat and Power (CHP) ESSO PETROLEUM COMPANY,LIMITED Existing Generating CMU EMG-18 EMG-18 +3 more SO45
Active • 2028-29 (T-4), 2027-28 (T-4) ...
379.81 MW
Esso Petroleum Company, Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (8 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-21 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 137.533 MW At these three HH times, aux load on Unit 5 = 2.513 MW Net generation from Unit 5 = 135.020 MW
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1001.05 MW
Engie, Great Coates, Grimsby, DN31 2TT (35 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
24.24 MW
Engie Great Coates, Grimsby, DN31 2TT (10 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks (2)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Combined Heat and Power (CHP) BRING ENERGY LIMITED Existing Generating CMU Humber Humber +2 more DN31
Active • 2024-25 (T-1), 2023-24 (T-1) ...
4.09 MW
Engie Great Coates, Grimsby, DN31 2TT (15 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the … (3)

Combined Heat and Power (CHP) BRING ENERGY LIMITED Existing Generating CMU Humber Humber +2 more DN31
Active • 2024-25 (T-1), 2023-24 (T-1) ...
6.14 MW
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (4 components)
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
Combined Heat and Power (CHP) VITAL ENERGI SOLUTIONS LIMITED New Build Generating CMU COV COV +1 more CV2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.03 MW
Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF (20 components)

A gas engine CHP site providing electricity & heat to the associated development

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE WST_CRB2 CE WST_CRB2 +6 more W12
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.79 MW
Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ (1 component)

VIT42A - CHP unit at Energy Centre, Northwick Park Hospital, Watford Road, London, HA1 3UJ

Active • 2025-26 (T-4)
2.41 MW
Energy Centre, Lower Mosley Street, Manchester M2 3GX (4 components)

A 3.36MW gas fired reciprocating engine CHP.

Combined Heat and Power (CHP) VITAL ENERGI SOLUTIONS LIMITED New Build Generating CMU CQH CQH +1 more M2
Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.00 MW
Energy Centre, Ashton Street, Liverpool, L69 3GB (2 components)

One of the three CHP units at Energy Centre, Ashton Street, Liverpool, L69 3GB

Active • 2025-26 (T-4), 2025-26 (T-1)
2.24 MW
Energy Centre, Ashton Street, L69 3GB (4 components)

One of three CHP units at Energy Centre, Ashton Street, L69 3GB

Active • 2025-26 (T-4), 2025-26 (T-1)
4.49 MW
ENERGY CENTRE, 13 HOOKERS ROAD, WALTHAMSTOW, LONDON, E17 6DPTQ 358 896 , (6 components)

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC CE_Aggregated 3 CE_Aggregated 3 E17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.02 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (36 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
45.86 MW
Ellifoot Lane, Burstwick, HU12 9EB (5 components)
• A Distribution Connected 4.5MW gas fueled generating station
• a Combined Heat and Power Plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.57 MW
Elephant Park Energy Centre, Rodney Road, London, SE17 1FJ (14 components)
• A site with two gas engine CHPs providing hot water to a local district heating network
• A site with two gas engine CHPs, providing hot water to a local district heating network
Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU HEY_CHP HEY_CHP +4 more SE17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
10.37 MW
Dunswell Lane, Cottingham, Hull HU16 4JT (2 components)

1 x 1,400kW gas fired CHP at a horticultural site. Maximum Export capacity of connection agreement is 1,400MW.

Combined Heat and Power (CHP) FLEXITRICITY LIMITED Existing Generating CMU FLEX168 HU16
Active • 2028-29 (T-4), 2025-26 (T-1)
1.91 MW
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (14 components)
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Combined Heat and Power (CHP) KEMSLEY CHP LIMITED New Build Generating CMU DSK_1YR DSK_CHP +4 more ME10
Active • 2025-26 (T-4), 2024-25 (T-4) ...
366.04 MW
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (9 components)

A gas engine CHP site providing hot water to a local district heating network

Combined Heat and Power (CHP) E.ON UK PLC Existing Generating CMU CE_Aggregated CE_Aggregated +4 more UB7
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.51 MW
Drakemyre, Dalry KA24 5JJ (17 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
108.65 MW
Downs Rd, Sutton SM2 5PT (3 components)
• Behind the Meter CHP
• Emergency Behind the Meter Diesel Generator
Active • 2025-26 (T-4), 2025-26 (T-1)
1.87 MW
Donaldsons Nursery, Vinnetrow Road, Runcton, Chichester PO20 1QD (1 component)

Existing Generating CHP

Active • 2025-26 (T-1)
1.39 MW
Denmark Hill, Brixton, London, SE5 9RS (8 components)
• Behind the Meter CHP Unit
• CHP unit
• Gas fired CHP unit
Active • 2025-26 (T-1), 2023-24 (T-4) ...
19.03 MW
Denison Road, Selby YO8 8AN (1 component)

Behind the Meter CHP Unit

Active • 2025-26 (T-4)
Denison Road, Selby, North Yorkshire, YO8 8AN (13 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
59.24 MW