Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

271 unique locations (2447 components) - Page 1 of 11

2 Leeds City Office Park, Leeds, LS11 5BD (11 components)
• Office site with behind the meter back-up generation
• Office site with behind the meter back-up generation.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
2 Whitehouse Way, Peterlee, County Durham, SR8 2RA (6 components)

3 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
43 Devon Street, London, SE15 1AL (12 components)
• Lithium ion battery storage at a material recycling facility in south east London.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
530 London Road Thornton Heath London CR7 7YE (9 components)

Hospital

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
97 Talbot Road, Stretford, Manchester, Lancashire, M16 0TW (5 components)

Offsite with behind the meter generation

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Addo Food Group Fulney Lane Spalding Lincolnshire PE12 6EZ (4 components)

4 MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
ADDO FOOD GROUP, FULNEY LANE, SPALDING, LINCOLNSHIRE, PE12 6EZ (4 components)

0.27MW of demand reduction

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Alexandra Warehouse, Ravenhead Road, St Helens, WA10 3LR (8 components)

Crystal glass recycling facility.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Alton WW, ALTON WATER WW, Holbrook Lane, Stutton, IPSWICH, IP9 2RY (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
Anwick STW, ANWICK STW, River Lane, Anwick, SLEAFORD Lincolnshire, NG34 9SP, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
Ardleigh WTW, ARDLEIGH-WW, Clover Way, Ardleigh, COLCHESTER, CO7 7PT (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
ASDA Aintree, Ormskirk Road Aintree, Liverpool, L10 3LN (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.28 MW
ASDA Bearsden, 80 Milngavie Road Bearsden, Glasgow, G61 2TX (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
9.08 MW
ASDA Bishopbriggs, 276 Kirkintilloch Road, Bishopbriggs, G64 2TP (3 components)

Disabling load of refrigeration plant through remote switch.

Inactive • 2019-20 (T-1)
ASDA Bromborough, Welton Road Croft Business Park, Bromborough, CH62 3QP (11 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.28 MW
ASDA Canterbury, Sturry Road, Canterbury, CT1 1DG (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
9.08 MW
ASDA Carlisle, Chandler Way Park House, Carlisle, CA3 OJQ (3 components)

Disabling load of refrigeration plant through remote switch.

Inactive • 2019-20 (T-1)
ASDA Chester, Greyhound Retail Park unit 33, Chester, CH1 4QQ (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Active • 2024-25 (T-1), 2023-24 (T-1) ...
9.03 MW
ASDA Coventry, Brade Drive, Walsgrave, CV2 2PN (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Active • 2024-25 (T-1), 2023-24 (T-1) ...
9.03 MW
ASDA Dyce, River View Drive , Aberdeen, AB21 7NG (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Active • 2024-25 (T-1), 2023-24 (T-1) ...
4.75 MW
ASDA Eastgate, Eastgate Shopping Centre , Basildon, SS14 1AE (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Active • 2024-25 (T-1), 2023-24 (T-1) ...
9.03 MW
ASDA Eastlands, ASDA Sport City Ashton New Road, Manchester, M11 4BD (3 components)

Disabling load of refrigeration plant through remote switch.

Inactive • 2019-20 (T-1)
ASDA Eastleigh, Bournemouth Road, Chandlers Ford, SO53 3YJ (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
9.08 MW
ASDA Gosforth, Hollywood Avenue Gosforth, Newcastle Upon Tyne, NE35 5BU (3 components)

Disabling load of refrigeration plant through remote switch.

Inactive • 2019-20 (T-1)
ASDA Gravesend, Thames Way , Gravesend, DA11 0DQ (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Active • 2024-25 (T-1), 2023-24 (T-1) ...
9.03 MW
Loading map...
Showing 25 locations