Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

898 unique locations (12197 components) - Page 1 of 36

100 The Jewel, Brunstane, Edinburgh, EH15 3AR (6 components)
Active • 2025-26 (T-4), 2023-24 (T-1) ...
150 Maylands Ave, Hemel Hempstead Industrial Estate, Hemel Hempstead HP2 7DF (6 components)

3MW - 3,45MWh Battery Energy Storage System

Active • 2025-26 (T-4), 2022-23 (T-1)
2.35 MW
160 Corporation Road, Newport, Gwent, NP19 0WF (14 components)

0.39MW Battery Storage located at Newport Bus depot

Active • 2026-27 (T-4), 2024-25 (T-4) ...
6.42 MW
2 Ford St, Coventry CV1 5WT (9 components)

1.2MW Battery Storage located at National Express Coventry

Active • 2024-25 (T-4), 2022-23 (T-1) ...
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
ADM Milling, 9 Brunel Rd, Corby NN17 4SL (13 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
3.03 MW
ADM Milling -Avonmouth, Avonmouth Old Dock, Avonmouth, Bristol BS11 9DL, United Kingdom (13 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.90 MW
ADM Milling Knottingley, Forge Mill La, Knottingley WF11 8HR (12 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.90 MW
ADM Milling, Leith, Edinburgh EH6 6PQ (4 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2022-23 (T-1)
ADM Seaforth, Seaforth Dock, Liverpool, Merseyside, L21 4PG (13 components)

The CMU Component reduces import demand by turning on back up generation.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.90 MW
AIRFIELD WAY, WELDON, CORBY, NORTHAMPTONSHIRE, NN17 (12 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.85 MW
Alderly Pumping, Pumping Station, Alderly, Wotton Under Edge, GL12 7PQ (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.31 MW
ALLINGTON CIRCLE, KINGSMEAD, MILTON KEYNES, MK4 (9 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
14.40 MW
ARDLEIGH-RIVER INTAKE PS, BY RIVER COLNE OP ROUSE WAY IPSWICH ROAD, CO4 0XB (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Ark Data Centres, Cody Park, Old Ively Road, Farnborough, GU14 0LH (5 components)

6MW - 6.9MWh Battery Energy Storage System

Active • 2025-26 (T-4), 2022-23 (T-1)
ASDA Aintree, Ormskirk Road Aintree, Liverpool, L10 3LN (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.28 MW
Asda, Armadale Station Station Road, Armadale, EH48 3PR (8 components)

Load curtailment

Active • 2025-26 (T-4), 2024-25 (T-1) ...
9.03 MW
ASDA Ayr, Liberator Drive , Ayr, KA8 9BF (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
13.83 MW
ASDA Barking, Genoa Building, Barking, IG11 8FJ (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
13.83 MW
ASDA Barnsley, Old Mill Lane , Barnsley, S71 1LN (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
13.83 MW
ASDA Barry, Ffordd Y Mileniwm, Barry, CF62 5AT (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
9.04 MW
ASDA Basildon, Heron Retail Park Miles Grey Road, Basildon, SS14 3AS (14 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
13.83 MW
ASDA Bearsden, 80 Milngavie Road Bearsden, Glasgow, G61 2TX (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
9.08 MW
ASDA Blackpool, Cherry Tree Road, Blackpool, FY4 4QH (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
13.83 MW
ASDA Blackwood, High Street, Blackwood, NP12 0NT (13 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2024-25 (T-1) ...
13.83 MW
Loading map...
Showing 25 locations