Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

24 unique locations (871 components)

UB10 (42 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
173.42 MW
The Bridge Shopping Centre 11 Somers Road North PO1 1SL (6 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2025-26 (T-4) ...
SURREY WATER ROAD LONDON SE16 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
139.99 MW
SP4 (32 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
81.97 MW
SP3 (18 components)
• Domestic EV
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
58.79 MW
SL9 (42 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
88.01 MW
S6 (45 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
103.84 MW
Plot 168, Block D, Unit 11 Greenwood Way OX11 6DL (5 components)
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2024-25 (T-1) ...
PL14 (22 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
85.24 MW
NR8 (37 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
132.82 MW
New Victoria Park, Grange Road, Glasgow, G42 9LF (31 components)

Generators at hospital site

Active • 2024-25 (T-1), 2023-24 (T-1) ...
3.41 MW
Newlands Farm, Tanners Lane, Fareham, PO14 2HT (11 components)
• 10MW Storage
• 15MW of Battery Energy Storage Systems
• 20MW of Battery Energy Storage Systems
Active • 2025-26 (T-4), 2024-25 (T-1) ...
18.28 MW
MK10 (28 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
57.46 MW
KT8 (27 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
28.37 MW
G66 (49 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
240.22 MW
Component has yet to be procurred (249 components)

Component has yet to be procurred

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1238.88 MW
Celsa Steel, Seawall Road, Tremorfa, Cardiff, CF24 5TH (31 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
166.57 MW
BS27 (10 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
54.06 MW
BH22 (37 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
110.38 MW
BH21 (71 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
237.60 MW
BH12 (14 components)
• Domestic EV
• Domestic EV charge point
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
65.93 MW
BA4 (12 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
55.97 MW
133 Balornock Road, Glasgow, G21 3UW (33 components)

Generators on hospital site

Active • 2024-25 (T-1), 2023-24 (T-1) ...
13.41 MW
10 Queens Drive , Kilmarnock, KA1 3XF (7 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 24 locations