Reciprocating engines

20 unique locations (446 components)

Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (20 components)
• New build gas generator
• Operational reciprocating gas engines
Active • 2022-23 (T-4), 2023-24 (T-4) ...
15.06 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
24.33 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (13 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2023-24 (T-4), 2024-25 (T-1) ...
52.07 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
27.91 MW
Millfield Lane Haydock Industrial Estate Haydock St Helens WA11 9UT (19 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2023-24 (T-1), 2024-25 (T-4) ...
46.53 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (12 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2023-24 (T-1), 2025-26 (T-4) ...
211.92 MW
21.56 MW
Land at Kestral Road, Mansfield, NG18 5FU (11 components)

Reciprocating genset in acoustic enclosure

Active • 2022-23 (T-1), 2023-24 (T-1) ...
18.48 MW
Land at Enterprise Court, Corby, NN18 8ES (83 components)

Reciprocating genset

Active • 2024-25 (T-1), 2025-26 (T-1) ...
55.87 MW
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (45 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. connections and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
119.74 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
28.28 MW
Dig Gate Lane, Rochdale, OL16 4NR (3 components)

4.4MW gas fired peaking power plant

Active • 2026-27 (T-4), 2027-28 (T-4) ...
12.45 MW
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QG (5 components)

10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2024-25 (T-4), 2026-27 (T-4) ...
36.98 MW
Cavendish Road 33kV Generation, Land Behind Caswell House, Cavendish Road, Stevenage, SG1 2ET (22 components)
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
51.60 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2023-24 (T-1), 2024-25 (T-4) ...
27.31 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (27 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2024-25 (T-4), 2025-26 (T-4) ...
28.70 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2024-25 (T-1), 2024-25 (T-4) ...
39.67 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (27 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
18.47 MW
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (14 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2023-24 (T-1), 2024-25 (T-1) ...
14.36 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (7 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2023-24 (T-1), 2025-26 (T-1) ...
37.40 MW
Loading map...
Showing 20 locations