CATHKIN ENERGY STORAGE LIMITED
Back to Search
All Components
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
All Components for CATHKIN ENERGY STORAGE LIMITED
Found 2 component records.
Location
Delivery Year
Auction Name
De-Rated Capacity
Location
Desc
Displaying 1-2 of 2.
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY
Storage (Duration 9h)
- Standalone battery storage system connecting at 33kV to the East Killbride substation
6.58 MW
CMU: CK_234
2027-28 (T-4)
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY
Storage (Duration 2h)
- Standalone battery storage system connecting at 33kV to the East Killbride substation
12.90 MW
CMU: CK_241
2025-26 (T-1)
Data fetch time: 0.572s