CATHKIN ENERGY STORAGE LIMITED
Back to Search
Capacity
View by Year/Auction
View by Capacity
View All Components
View All on Search Page
Components Ranked by De-rated Capacity
Sort: Largest First
Displaying 1-2 of 2 components with capacity data.
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY
6.58 MW
Storage (Duration 9h)
Standalone battery storage system connecting at 33kV to the East Killbride substation
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY
12.90 MW
Storage (Duration 2h)
Standalone battery storage system connecting at 33kV to the East Killbride substation
Data fetch time: 0.353s